Captive Power Plant Project at Joratarai

SDRM Metaliks has proposed installation of a 25 MW captive power plant comprising 16 MW waste heat recovery and 9 MW AFBC-based units to support...

IP Based CCTV System with CAMC

SITC of IP based CCTVs along with 4 year CAMC post 1 year warranty period. The bid due date is 28-May-2026. Tender ID:...