Swaraj Associates Proposes Ulwe Residential Project
Swaraj Associates is seeking environmental clearance for a residential project at Plot Nos. 73, 74, and 75, Se...
Sobha Limited Plans Expansion of Residential Project in Kozhikode
Sobha Limited has applied for Composite Environmental and CRZ Clearance for the expansion of its residential b...
ONGC Plans 172 New Wells in KG Basin
Environmental clearance is sought for drilling 172 wells across 8 Petroleum Mining Lease (PML) blocks within O...
API Manufacturing Plant Proposed by Kajay Remedies
Kajay Remedies proposes to set up an Active Pharmaceutical Ingredients (API) and intermediates manufacturing f...
Balance Works and Bypass Construction Planned on NH-158
MoRTH has invited bids for the balance works of 4-lane configuration of the Ras–Beawar section, construction o...
Revamping of Trunk Infrastructure Proposed at MEPZ SEZ
Revamping of Trunk Infrastructure with Roads, Landscape, Flood Mitigation, irrigation, transit system, parking...
Supply of Solar Power Proposed for Chennai Airport
Supply of electrical energy from renewable energy resources, specifically solar power plants owned by firm or...
Traction Substations and Associated Works Planned in Lumding Division
Design, supply, erection, testing, and commissioning of 132/27 kV, 21.6/30.24 MVA traction substations (TSS) a...
Fire Safety and Electrical Works at Annexes Building, New Delhi
SITC of Gas Suppression System along with Intelligent Fire Addressable System, electrical work at MSS Section...
Consultancy for Traffic & Intersection Design in Indore
Consultancy services for feasibility study and detailed design of various intersections in Indore City based o...
Anganwadi Centre Buildings in Maram Tribe Habitations (Group-5)
Construction of 10 units of Anganwadi Centre Buildings (Group-5) in Particularly Vulnerable Tribal Group (PVTG...
Construction of Anganwadi Centre Buildings in Senapati District (Group-4)
Construction of 10 units of Anganwadi Centre Buildings (Group-4) in Particularly Vulnerable Tribal Group (PVTG...
Anganwadi Centre Buildings in Maram Tribe Habitations, Manipur
Construction of 10 units of Anganwadi Centre Buildings (Group-3) in Particularly Vulnerable Tribal Group (PVTG...
Construction of Anganwadi Centre Buildings in Senapati District (Group-2)
Construction of 10 units of Anganwadi Centre Buildings (Group-2) in Particularly Vulnerable Tribal Group (PVTG...
Construction of Anganwadi Centre Buildings in Senapati District (Group-1)
Construction of 10 units of Anganwadi Centre buildings (Group-I) in Particularly Vulnerable Tribal Group (PVTG...
Biodiversity Court Construction at Bankhandi Zoological Park
Construction of Zoological park at Bankhandi, Dehra, District Kangra, Himachal Pradesh Phase-I(C). Subwork/Pac...
AMC for Civil, Electrical and Mechanical Works at CEC
Annual Maintenance Contract for routine civil repairing maintenance minor construction work including minor el...
Bengaluru’s Longest Skywalk at Hudson Circle to Boost Connectivity
BBMP is fast-tracking a 150-meter skywalk at Hudson Circle, Bengaluru’s busiest junction, connecting Cubbon Pa...
Grain-Based Ethanol Plant Expansion in West Medinipur
Svaksha Distillery is seeking environmental clearance to expand its distillery plant by adding a 225 KLD grain...
Explosives Manufacturing Facility Proposed in Dhule, Maharashtra
Solar Explochem is seeking environmental clearance for setting up manufacturing facilities for nitrate mixture...
Redevelopment Project at Prabhadevi by Sri Lotus Developers
Sri Lotus Developers and Realty is seeking environmental clearance for the proposed redevelopment of Deep Laxm...
Temple Tree Residential Project Proposed in Bengaluru
Vista Spaces Temple Tree Pvt. Ltd. has applied for environmental clearance for its residential apartment proje...
