Shreeji Intermediate Seeks Exemption for EC
M/s. Shreeji Intermediate plans to manufacture other synthetic organic chemicals & chemical intermediates, inc...
Expansion of Synthetic Organic Manufacturing by Pearl Colours
Pearl Colours Industries has proposed expansion in existing plant capacity of Synthetic Organic Chemicals [Dye...
NH-948 Coimbatore-Sathyamangalam Road Widening Approved
Widening of existing 2 lane paved shoulder to 4 Lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to...
Standalone Flyover cum ROB on NH-353B in Gadchandur
Construction of Standalone Flyover cum ROB from DC.66.600 to DC.68.800 sec of NH-353B in Gadchandur Town in th...
Shegaon-Deori Phata Road NH-548C to Undergo Repairs
Repair and Maintenance of Shegaon Deori Phata Road NH 548C (ch.0.00 to 41.500 in the state of Maharashtra (At...
Takarkhed Bhagile-Jalna Bypass NH-753A PBMC Contract
Performance based Maintenance Contracts (PBMC) for Takarkhed Bhagile to Jalna section (km 108.500 to km 153.16...
Khamgaon-Deulgaon Sakarsha NH-548C Section Maintenance
Performance based Maintenance Contracts (PBMC) for maintenance of Khamgaon to Deulgaon Sakarsha section of NH5...
PBMC for Chikhli-Takarkhed Bhagile Section of NH-753A
Performance based Maintenance Contracts (PBMC) Estimate of Chikhli to Takarkhed Bhagile section of NH 753A fro...
PBMC for Deulgaon Sakarsha-Mehkar NH-548C Section
Performance based Maintenance Contracts (PBMC) Estimate of Deulgaon Sakarsha Mehkar section of NH 548C (Design...
NH-548C Khamgaon-Shegaon Section Maintenance Work
Maintenance of Khamgaon Shegaon section of NH 548C (Design Km 0.000 to Km 22.800) Two.Four Lane with Paved sho...
Mandla-Nainpur Section of NH-543 Set for Upgradation
Upgradation and reconstruction of Mandla - Nainpur Section of NH 543 from Km 190/400 to Km 236/500 to two lane...
A-One Steels to Expand Integrated Steel Plant in Andhra
A-One Steels India Pvt. Ltd. has sought environmental clearance for the proposed expansion of its integrated s...
GDA Seeks DPR Proposals for Harnandipuram Township
GDA has invited private firms to submit plans for the detailed project report (DPR) for the Harnandipuram town...
Industrial Area Development Proposed at Mathasula
Environmental clearance is sought for the development of an industrial area at Mathasula, Tehsil Jamwaramgarh,...
Bulk Drug Unit Expansion at G.I.D.C. Estate, Vapi
Vital Health Care has applied for environmental clearance for the proposed expansion of its Synthetic Organic...
Valsad Synthetic Organic Chemicals Plant Expansion Planned
Jalaram Chemicals plans to expand its synthetic organic chemicals manufacturing plant at Plot No. 3114, GIDC S...
Vapi Synthetic Organic Chemicals Unit Set for Expansion
Bhavini Products, Unit-II, has proposed an expansion of its existing plant to include a synthetic organic chem...
Karmaveer Shankarrao Kale to expand sugar unit to 4,000 TCD
Karmaveer Shankarrao Kale Sahakari Sakhar Karkhana Ltd. plans to expand its sugar unit capacity from 4,000 TCD...
Pernod Ricard India to expand grain-based distillery in Nashik
Pernod Ricard India plans to expand its existing grain-based distillery in Kadwa Mhalungi, Pade, Dindori, Nash...
Short Term Maintenance on NH-34 (Km. 25.700 to 31.000)
E-tenders are invited for short term maintenance works from Km. 25.700 to Km. 31.000 on NH-34 (New NH-12) in t...
Performance-Based Maintenance Contract for NH 765D, Telangana
Etenders are invited for the performance-based maintenance contract for the two-lane with paved shoulder and f...
6-Lane Elevated Structure Extension at Rayya on NH-03
E-tender is invited for the construction of a 6-lane elevated structure extension at Rayya at km 420.070 on th...
