Integrated Solar Panel Manufacturing Unit in Dhenkanal
Waaree Energies Limited has proposed the establishment of an integrated solar panel manufacturing unit at Village Bandhanuagaon, Chattia, Ambakhal, within the T...
Ion Exchange Wins Order from Adani Power for Water Management Solutions
Ion Exchange has secured a contract from Adani Power for a comprehensive total water and environment management solution for the 2x800 MW un...
Praveg Secures LoA for O&M of 30 Bhungas at Dhordo
Praveg has received a Letter of Award (LoA) from Tourism Corporation of Gujarat Limited (TCGL) for Operation, Maintenance and Management (O&...
Avantel Secures Satcom Equipment Contract from Bharat Electronics Limited
Avantel Limited has bagged a contract from Bharat Electronics Limited for the Supply of Satcom Equipment. The execution of the order is targ...
Avantel Secures Satcom Systems Contract from L&T
Avantel Limited has bagged a contract from Larsen & Toubro Limited for the Supply of Satcom Systems. The execution of the order is targeted...
Marsons Secures ?675 Crore LOI for 150 MW Solar PV Project in Rajasthan
Marsons has received a Letter of Intent (LOI) from NACOF OORJA to develop a 150 MW (AC) Grid-Interactive Ground-Mounted Solar PV Power Gener...
KPI Green Energy Awards Solar Plant Contract to Bondada
KPI Green Energy Limited has issued a work order to Bondada Engineering Limited for the supply of materials and installation work for a sola...
Surana Solar Secures LOA for 54 MW Solar Project in Maharashtra
Surana Solar has been awarded a Letter of Award (LOA) for the development of solar photovoltaic power generating stations with a total capac...
Sunsure Energy Signs 13.5 MWp Solar PPA with Kirloskar Brothers to Supply 20 Million Units Annually
Sunsure Energy has entered into a 13.5 MWp solar open access power purchase agreement (PPA) with Kirloskar Brothers Limited (KBL), aimed at...
Package-1 of Taliha to Tato Stretch of NH-913 Road Construction
Construction of road from km 0.000 to Km 60.250 (package-1) of Taliha to Tato stretch of NH-913(Frontier Highway) to Intermediate Lane on EP...
Package-7 of Lada-Sarli section of NH-913 Road Construction
Construction of road from km 168.00 to km 183.400 (Package-7) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC...
Bile to Migging Stretch Road Construction on NH-913 Underway
Construction of road from Km 0.000 to Km 17.812 of Bile to Migging stretch (Ch.0.0 at Migging) of NH-913 (Frontier Highway) to Intermediate...
Package-1 of Bomdila-Nafra-Lada section of NH-913 Road Construction
Construction of road from km 19.554 to km 34.700 (Package-1) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane...
Package-4 of Lada-Sarli section of NH-913 Road Construction
Construction of road from km 65.51 to km 85.60 (Package-4) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mo...
Package-1 of Lada-Sarli section of NH-913 Road Construction
Construction of road from km 0.000 to km 16.820 (Package-1) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC m...
Package-3 of Lada-Sarli section of NH-913 Road Construction
Construction of road from km 43.65 to km 65.51 (Package-3) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mo...
Package-2 of Lada-Sarli section of NH-913 Road Construction
Construction of road from km 16.820 to km 43.650 (Package-2) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC...
Package-1 of Sarli-Huri section of NH-913 Road Construction
Construction of road from km 0.000 to km 35.000 (Package-1) of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC m...
Mantralayam Bypass Construction Begins on NH-167, Andhra Pradesh
Construction of Mantralayam bypass of 2 lanes with paved shoulders on NH 167 under NH(O) on EPC mode in Kurnool district of Andhra Pradesh S...
Design and Construction of Elevated Viaduct and station for Corridor 1A. The bid due date is 17-Oct-2024. Tender ID: 2024_KRIDE_202814_1....
Data Monitoring System Installation at Malleswaram EPS
Data Acquisition and Monitoring System (DAMS) along with field instrumentation at the Malleswaram EPS, Rajahmundry Asset. The bid due date i...
Flooring and Upgradation at Malda Medical College & Hospital
Upgradation and Raising of flooring of Old Hospital Building Malda Medical College and Hospital under Malda Division, PWD in the District of...
