Markolines Wins Micro-Surfacing Contract on NH-44
Markolines has secured an order from Athaang Dichpally Tollway Private Limited for Rectification works of flex...
Novopor to Set Up Chemicals Unit in Bharuch
Novopor Advanced Science proposes a greenfield project to manufacture specialty chemicals and pesticide-specif...
DPR Consultancy for Four-Laning of NH-167 in Telangana
Consultancy services for preparation of Detailed Project Report (DPR) for four-laning from Km 15.525 to Km 234...
IP-Based Video Surveillance System Proposed for EMU/MEMU/DEMU Coaches
Supply, Installation, Testing and Commissioning of IP based Video Surveillance System (VSS) in EMU,MEMU,DEMU C...
High Street Developers to Expand Kolhapur Project
Environmental clearance is sought for the proposed expansion of a residential and commercial development locat...
DPR Consultancy for Mahabubnagar Bypass on NH-167 and NH-167N
Consultancy Services for preparation of DPR for the work Construction of 4 lane Bypass to Mahabubnagar Town fr...
DPR Consultancy for NH-30 Four-Laning and Kothagudem Bypass
Consultancy services for preparation of Detailed Project Report (DPR) for four-laning of Rudrampur to Bhadrach...
DPR Preparation for Bridge Construction in Madhya Pradesh
Consultancy Services for preparation of DPR for I. Widening to 2L PS of balance reaches Km 184.840 to Km 190.0...
Diamond Power Secures Conductor Supply Order from Adani Energy
Diamond Power Infrastructure has received a Letter of Intent from Adani Energy Solutions Limited for the suppl...
Rectification Measures & DPR for NH-353C in Telangana
Consultancy services for rectification measures on Mahadevpur to Bhupalapally section (Km 25.0 to 59.2; Design...
Lloyds Metals to establish 230 MW captive power plant at Konsari
The project includes a 230 MW captive power plant to support steel production. It is located at MIDC Konsari,...
Distillery Capacity Expansion at Hathin, Palwal
Ashoka Distillers & Chemicals is planning to expand its grain-based distillery capacity from 160 KLPD to 960 K...
RailTel Secures Order for 8.4 Gbps Internet at CCL
RailTel Corporation of India has received a work order from Central Coalfields Limited (CCL) for providing 8.4...
Advertising Rights Concession Tendered at Surat International Airport
Request for Proposal (RFP) for advertising rights concession to design, develop, operate, and market the adver...
5KW On-Grid Solar Tree Installation Planned at VOC Port
VOC Port Authority has invited bids for the supply and installation of one 5KW on-grid solar tree at VOCPA pre...
Electrical Works Tendered for ILS Frangible Hut at Surat Airport
Construction of new Instrument Landing System (ILS) frangible hut at Surat International Airport. SH: Electric...
Anthem Biosciences Expands with New API Manufacturing Facilities
Anthem Biosciences is ramping up its manufacturing capacity to meet global demand for fermentation-based APIs...
Repair and Facility Upgrade Tendered at CISF Barrack, Bhopal Airport
Miscellaneous repair works in Central Industrial Security Force (CISF) barrack at Raja Bhoj Airport, Bhopal. S...
Coastal Promenade Development Work Planned in Diu
Development and Beautification of Costal Promenade, Diu (EPC) (2nd Call). The bid due date is 13-Aug-2025. Ten...
Birla Estates Plans TOD Housing in Sector 71
Environmental clearance is sought for the proposed Group Housing Colony Under TOD Policy 2016 bearing Licence...
Authority Engineer Services for Vellore Bypass Construction in Tamil Nadu
Consultancy services for Authority Engineer for supervision of construction of four-lane bypass to Vellore tow...
Enviro Infra Secures BWSSB Order for Mahadevapura WWTP Project
Enviro Infra has bagged an order from Bangalore Water Supply and Sewerage Board (BWSSB) for the development of...
