Installation of 245 KWp Solar PV System at ISBT Kashmere Gate
Supply, Installation, Testing and Commissioning of grid connected 245 KWp (180 KWp and 65 KWp) Solar PV system...
Hejjala-Chamarajanagar Rail Line to Span 141 km
The 141 km Hejjala-Chamarajanagar railway line in Karnataka will pass through key locations such as Harohalli,...
Bituminous Concrete Road Works at SAI NCOE Aurangabad
Providing and laying of the bituminous concrete road using crushed stone aggregates and allied works like RCC...
K-RIDE Unveils Indias Longest Precast U-Girder
K-RIDE, a joint venture of the Ministry of Railways and the Karnataka government, has successfully launched In...
Dammu Biofuels seeks EC for grain-based ethanol project
Dammu Biofuels seeks environmental clearance for its proposed Grain-based Ethanol Project with a production ca...
Telangana Plans New Osmania General Hospital in Hyderabad
The Telangana government is set to construct a new Osmania General Hospital in Goshamahal, Nampally, Hyderabad...
Multi-Speciality Hospital Planned Along NH-58, Muzaffarnagar
Environmental clearance is sought for proposed multi-speciality hospital at Khasra No. 332, 335, and 300 in Vi...
LG Electronics plans third manufacturing facility in India
LG Electronics is planning to establish its third manufacturing facility in India, its first expansion since t...
EC Sought for Hotel Project in Ayodhya
Jeewani Hospitality has sought environmental clearance for the development of a hotel at Plot Nos. 298, 299, 3...
Waste to Energy Plant Expansion Adjacent to Tehkhand Depot
Tehkhand Waste To Electricity Project Limited proposes to expand the existing 25 MW Waste to Energy plant by 2...
Water Infrastructure Construction at NIT Meghalaya Sohra
Construction of RCC Weir, Sump Well, Pump House, Fencing and Laying of Pipes including Electrical Power Supply...
EC Sought for Bulk Drug Manufacturing Unit by Swapanthi
Swapanthi Life Science seeks environmental clearance for establishing a Bulk Drugs and Drug Intermediates manu...
Greenko to Build 2560 MW Pumped Storage in Rajasthan
Greenko Energies Private Limited is developing the 2560 MW Sukhpura Off-Stream Closed Loop Pumped Storage Proj...
EC Sought for Bulk Drug Unit by Mole Labs
Mole Labs Private Limited seeks environmental clearance to establish a Bulk Drugs and Drug Intermediates manuf...
Internal Roads Bituminous Topping at NSC Mumbai
Bituminous topping of internal roads and development of new parking area at NSC Mumbai. The bid due date is 30...
TPWODL commissions 33/11 KV substation in Jharsuguda
TPWODL has commissioned a new 33/11 KV AIS power substation at Pokhrasale in Jharsuguda district as part of it...
EC Sought for Medical College in Sirsa
The Directorate of Medical Education & Research, Haryana, has proposed the Baba Sarsai Nath Government Medical...
Shri Atal Bihari Vajpayee Medical College Plans Expansion
Shri Atal Bihari Vajpayee Medical College and Research Institute proposes a hospital and medical college expan...
Anand Rathi Group to develop an educational complex in Pali district
Anand Rathi Group is set to develop a state-of-the-art educational complex in Pali district, addressing the re...
EC Sought for 776 Tenements at Stanley Hospital, Chennai
The proposed project involves the construction of 776 tenements under the Stanley Hospital (Seven Well) Scheme...
PURE EV announces ?400 crore investment for a new facility in Telangana
PURE EV plans to invest ?400 crore in a second manufacturing facility spanning 46 acres in Telangana, set to b...
EC Sought for Hazardous Waste Treatment Facility in Gujarat
Environmental clearance is sought for the proposed Integrated Common Hazardous Waste Treatment, Storage, and D...
