Consultancy for Quality Control on NH-58 Widening Project
Consultancy Service forproof checking, assisting supervision of the work, quality control of work for Widening of existing 2 lane road to 4...
SITC of 15 KVA DG Set at FCI FSD Kullu Announced
Supply, installation, testing, and commissioning (SITC)of 15 Kva Dg Set (As per CPCB-IV Norms) with AMF PANEL including providing earthing,...
Union Bank of India Seeks Architect for Renovation Project
Union Bank of India invites application for selection of appointment of Project Architect/Consultant preferably having office in Chennai for...
SITC of 15 KVA DG Set at FCI FSD Palampur Planned
Supply, installation, testing, and commissioning of a 15 KVA DG set (as per CPCB-IV norms) with an AMF panel, including earthing, foundation...
Expansion Project for Maruti Suzukis Automobile Manufacturing Facility in Manesar
Maruti Suzuki India Limited is applying for Terms of Reference (ToR) to the SEAC, Haryana, for obtaining Environmental Clearance (EC) for th...
Consultant Services Sought for Kanigiri Bypass Construction
Tenders are invited for consultant services to assist the Assistant Engineer in supervising the construction of the Kanigiri Bypass on NH 56...
SITC of 20 KVA DG Set at FCI FSD GKT Nurpur
SITC of 20 KVA DG Set (As per CPCB-IV Norms) with AMF Panel including providing earthing, foundation, and providing roofing with profile she...
SITC of 15 KVA DG Set at FCI FSD Chamba Approved
SITC of 15 KVA DG Set (As per CPCB-IV Norms) with AMF Panel including providing earthing, foundation, and providing roofing with profile she...
SITC of 15 KVA DG Set at FCI FSD Tanda-Kholi Announced
SITC of 15 KVA DG Set (As per CPCB-IV Norms) with AMF Panel including providing earthing, foundation, and providing roofing with profile sh...
Off-Grid Solar Power Installation at BSF Border Outposts in Jammu
Providing, installation, testing and commissioning of 25 KWp off grid solar power plant at 10 BOPs of SHQ BSF Jammu, under FTR HQ Jammu. The...
Reinforced Earth Walls and Box Culvert on NH-502A in Mizoram
Construction of 2 Nos. Reinforced Earth Wall for Restoration of road formation collapse at km 11.000 and km 11.050 and Reconstruction of Box...
Coal Handling Plant OLBC-9A for Pakri Barwadih Mining Project
Coal Handling Plant OLBC-9A Package for Pakri Barwadih Coal Mining Project. The bid due date is 18-Nov-2024....
Short-Term Maintenance Contract for NH-29 Kohima-Jessami Road
Short Term Maintenance Contract of NH-29 Kohima-Jessami Road Pkg-2 from Design Km 29.600 to Km. 51.500 Total Length 21.900 Km. Kohima and Ph...
10 MW Solar Photovoltaic Grid-Connected Power Plant at Paradip Port
Design, Engineering, Procurement and Supply, Construction, Erection, Testing, Commissioning, and Comprehensive Operation and Maintenance for...
VIP Guest House Construction at Rangit-IV H.E. Project in Sikkim
Construction of VIP Guest House (existing partially constructed Class-I Type Building) at Rangit-IV H.E. Project, JPCL, Sikkip, Soreng Distr...
Widening to 4-Lane on NH-353 in Khariar, Odisha
Widening and strengthening of existing 2 lane with paved shoulder to 4 lane with paved shoulder from Km 67/400 to Km 70/400 of NH-353 (Khari...
Installation of Solar Water Heaters at Border Outposts in Rajasthan
Installation of 1000 Liters per day (2x500 LPD ) solar water heater at 178 BOPs under FTR HQ Rajasthan. The bid due date is 11-Nov-2024....
Solex Energy Plans 15 GW Manufacturing Capacity by 2030
Solex Energy has announced plans to scale up its manufacturing capacity from 1.5 GW to 15 GW by 2030. This expansion includes the establishm...
API & Intermediates Manufacturing Unit Proposed in Vadodara
Alembic Pharmaceuticals Limited is applying for environmental clearance for its new manufacturing unit dedicated to Active Pharmaceutical In...
Biogenomics Limited Proposes Insulin Manufacturing Facility in Sanand, Gujarat
Biogenomics Limited has proposed a new project in Sanand, Gujarat, aimed at manufacturing various types of insulin, including Insulin Aspart...
Nath Titanates to Manufacture Synthetic Organic Chemicals in Aurangabad
Nath Titanates is seeking Environmental Clearance for their proposed synthetic organic chemical manufacturing activity at their existing ble...
Synthetic Organic Chemicals Production Expansion in Dombivli MIDC
Technochem is set to expand its synthetic organic chemicals manufacturing facility at Plot No. 9, Phase-I, Dombivli MIDC Industrial Estate,...
