Vocational Lab and Electrical Works Tender
Construction of a vocational lab under PM SHRI at Kendriya Vidyalaya school, provision of a 400 amp changeover switch and control box at Nora Sub...
Ramkrishna Forgings to Develop New Foundry Plant in Jamshedpur
Ramkrishna Forgings Limited is developing a new Foundry Plant VIII for the manufacturing of Grey, SG, CI, and ADI casting components. The plant will...
Operation of Water Treatment and RO Plant at Kharagpur
Operation of Water Treatment plant and RO plant with water supply to its respective areas at Dr. S. P. Mookherjee Superspeciality Hospital for 2024-25. The...
Environmental Clearance Sought for Expansion of Residential & Commercial Project in Pune
Bramha Corp Ltd. is seeking environmental clearance for the proposed expansion of a residential and commercial project located at S. No. 11, 11/1 to 11/18,...
Chemi Ceramics Seeks Environmental Clearance for Project in Navi Mumbai
Environmental clearance is sought for development permission for commercial building on bearing Plot no.16, Sector-12 situated at Village-Nerul, Taluka-Thane, D...
GE Renewable to Make Wind Turbine Parts in Pune
GE Renewable R&D India Private Limited plans to manufacture parts for wind turbines in Pune, Maharashtra, with a production capacity of 500 sets. The company...
Supply and Installation of 25 KLD STP at Metro Stations
Supply, installation, testing, and commissioning of a new 25 KLD Sewage Treatment Plant (STP), including dismantling existing plants at Chhatarpur (CHTP), Sulta...
Environmental Clearance Sought for Residential Apartment Project in Bengaluru
Environmental clearance is sought for a residential apartment project with a clubhouse and community area site, featuring a built-up area of 157,881.54 sq.m. Th...
Damodar Valley Corporation Secures ?10,050 Crore Loan for 2×800 MW Koderma Thermal Power Project
The Damodar Valley Corporation (DVC) has reached financial closure for its 2×800 MW Koderma Thermal Power Project (Phase-II) in Jharkhand, securing a loan agree...
NBSL Elevator to Manufacture Top Tracks in Tamil Nadu
NBSL Elevator Components plans to manufacture elevator top tracks with a total production capacity of 350,000 units. The facility is in Sriperumbudur, Tamil Nad...
Environmental Clearance Sought for VIHAV Supremus 3 Commercial Project
Environmental clearance is sought for the VIHAV Supremus 3 commercial project, located at Survey No. 313/p1, O.P. No. 55, F.P. No. 110, TPS No. 15...
Sonic Biochem to Produce Soya Protein in Madhya Pradesh
Sonic Biochem Extractions Pvt Ltd will produce functional soya protein concentrate with a production capacity of 4,000 metric tons. The facility will be in Mand...
Soil Investigation for Water Treatment Plant at Udaipur Military Station
Consultancy services for soil investigation required for the construction of a water treatment plant with a capacity of 10 lakh liters per day at Udaipur...
Elevator Installation at Suhatta Complex with 15 persons capacity
Tenders are invited for the supply, installation, testing, and commissioning (including maintenance for 5 years) of one 15-passenger elevator (lift) at Suhatta...
Reru Bridge Construction Balance Work Tende
Execution of balance work under risk and cost tender for the design and construction of a 50 m single-span major PMT bridge (Reru Bridge) (through...
Rajpur Renewables to Generate Wind Power in Gujarat
Rajpur Renewables Private Limited will generate power through wind turbines with a capacity of 30 megawatts. The project will be based in Jamnagar, Gujarat....
Bid for Roof Replacement at FSD Bhomaiya
Replacement of old AC Sheet roofing with GI Profile sheets in Godown no 7,8,9,10 and 11 at FSD Bhomaiya. The bid due date is 14-Oct-2024....
Desiltation Project for Upstream Konar River
Desiltation from upstream of Konar River at Intakes of BTPS A and B along with its channels for smooth inflow of water from channel to...
Vehicular Underpass Planned at Kudal Sangam
Construction of Vehicular underpass at Kudal Sangam cross at Km.305.446 Black spot ID KA 02 367 and VUP at Belgal cross at Km.307.151 Black...
Flyover and Junction Improvements on NH-67, Coimbatore
Construction of Flyover Including Junction Improvements from km 335/600 - 338/400 of NH 67 (Km 3/0 - 5/4 New NH 181) at Singanallur Junction...
Accident Spot Rectification at Lingampally X Road
Permanent rectification of Accident Spot at Lingampally X Road for construction of VOP at Km 463.138 on MH KNT Border to Sangareddy Section...
Six-Laning of Saharanpur Bypass to Ganeshpur Section
Construction of connecting road at BHS for six laning along with full access control provisions in stretches from Saharanpur bypass to Ganes...
