Agni Green Power Limited Secures Solar Power Plant Order from WBREDA
Agni Green Power Limited has been awarded a new solar power plant contract from the West Bengal Renewable Energy Development Agency (WBREDA). The scope of...
Annual maintenance of walk-in-cold room including DG set at Amrity Sericulture Farm
Annual maintenance of walk-in-cold room including 20KVA 3 phase diesel generator and 15 KVA servo voltage stabilizer at Grainage Building, Amrity Sericulture Fa...
Ramco Cements Unveils Gati Shakti Cargo Terminal in Andhra Pradesh
Ramco Cements has recently inaugurated its new Gati Shakti Cargo Terminal located at Jayanthipuram in Andhra Pradesh, India. This terminal marks a significant m...
Commercial complex at Noida
The environmental clearance is sought for the Proposed Commercial Complex encompassing offices, retail spaces, and additional restaurant facilities, located at...
Authority’s Engineer for Shewali Fata to Kalambhir section
Consultancy services for Authority's Engineer for Shewali Fata to Kalambhir section 0.443 to 4.500 Nizampur to Chadwel 13.485 to 26.265 in the state of Maharash...
RSOLEC Plans Rs. 6,000 Crore Investment in Vijayapura District for Solar Panel Manufacturing
Renaissance Solar and Electric Material company (RSOLEC), known for solar panel raw materials, eyes Vijayapura district with a Rs. 6,000 crore investment plan....
Construction Projects in NMRP Phase-2 Reach-1A Announced
Design and Construction of Elevated Metro Viaduct of length 17.624 km between Ch.21256.814 to Ch.38881.7 including Railway spans of length 79m & 100m and 6-lane...
Development of Residential Apartment Project at Bengaluru
Development of Residential Apartment Project at Sy No 1/1 & 80/2 of Boorugunte Village, Sarjapura Hobli, Anekal Taluk, Bangalore Urban District, Karnataka. The...
Carbon black manufacturing plant expansion at
The environmental clearance is sought for the expansion of Carbon Black Manufacturing Facility from 1.65 LTPA to 1.926 LTPA (EC Product) , Tyre- 3.24 LTPA,...
Indian Oil to Operate 344 km ParadipSomnathpurHaldia Pipeline
Indian Oil Corporation Limited will oversee the operation of the upcoming ParadipSomnathpurHaldia project, a 344km-long onshore product pipeline with a maximu...
KPI Green Energy Bags 9.40 MW Solar Power Project Orders
KPI Green Energy Limited secures new orders totaling 9.40 MW for solar power projects. KPI Green undertakes 5 MW capacity, while KPIG Energia Private Limited,...
Construction of Residential Quarters at AIIMS Rae Bareli
Construction of 84 nos. T-III S +7 28 nos. T-IV S + 7 and 28 nos. T-V S + 7 Quarters including Internal EI and...
Sewage treatment plant work under SBM at Nowgong
Construction of sewage treatment plant work under SBM(U) 2.0 at Nowgong. The bid due date is 10-Apr-2024. Tender ID: 2024_UAD_341299_1....
Deepening and Upgradation of Dabhel Water Treatment Plant
Designing and execution for the work Deepening and up gradation of existing Dabhel Water Treatment Plant Pond, Nani Daman. The completion is targeted in 11...
Jupiter Wagons Secures Order for 2,237 BOSM Wagons
Jupiter Wagons announces acquisition of an order for manufacturing and supplying 2,237 BOSM Wagons from the Ministry of Railways, valued at Rs 356.87 crore. The...
Mixed use development project at Fazilpur Jharsa village
The environmental clearance is sought for mixed used development project, comprising of facilities like office space, retail, Food court, located at Fazilpur Jh...
Comprehensive maintenance of 33 nos Diesel Generator sets at the BU campuses
Day to day operation and comprehensive maintenance of 33 nos Diesel Generator sets at the BU campuses for one year excluding supply of Diesel.(2nd Call)....
KNR Constructions Secures Major Water and Sewerage Projects in Telangana
KNR Constructions has been awarded the Letter of Acceptance (LoA) for water supply projects in 26 Urban Local Bodies (ULBs) and Sewerage Projects in 4...
CCTV Surveillance System at Cochin International Airport
Supply, installation, testing and commissioning of CCTV Surveillance System at Cochin International Airport. The bid due date is 27-Mar-2024. Tender ID: 2024_CI...
Expansion of Existing Steel Plant at Mirzapur village
Expansion of Existing Steel Plant by Installation of 6 No. 10 MT Induction Furnaces with Continuous Caster and Ladle and Rolling Mill with production capacity...
Tender for Nagpur Metro Rail Phase-2 Project Substations and SCADA System
Design, Supply, Installation, Testing and Commissioning of Receiving Cum Auxiliary Main Cum Traction Sub Stations Including Ehv Connection From Grid Substation,...
Gwalior Airport Terminal Completes Construction in Record Time
The Gwalior Airport terminal, built at a cost of Rs 498.50 crores, achieves completion within a remarkable 16-month period. Featuring a capacity to accommodate...
