Constuction of 1000 MT warehouse at Post Goregaon
Constuction of 1000 MT warehouse at Post Goregaon Ta Goregaon, District: Gondia. The bid due date is 18-Mar-2024. Tender ID: 2024_DOAWB_1008...
Electric Traction System to 2×25 kV at Feeding System in Wardha-Ballarshah Section
OHE modification work for Up-gradation of existing 1x25 kV Electric Traction System to 2x25 kV at Feeding System in Wardha-Ballarshah Sectio...
CO2 Fire Fighting System at Tanakpur Power Station
Supply and installation of Weight Surveillance Module for CO2 Fire Fighting System at Tanakpur Power Station. The bid due date is 13-Mar-202...
IT cum Commercial Building project expansion at Navi Mumbai
The environmental clearance is sought for the proposed expansion for IT cum commercial building development at plot no. D 43/3 & 43/4, TTC I...
Construction of 6 Elevated Metro Stations in NMRP Phase 2
Construction of 6 Nos Elevated Metro Stations (Cantonment, Kamptee Police Station, Kamptee Municipal Council, Dragon Palace, Golf Club and K...
Industrial Bioplastic Project to come up in Uttar Pradesh
Balrampur Chini Mills Limited plans to setup an industrial bioplastic plant in the state of Uttar Pradesh. The plant will come up on a green...
Amendment in existing EC of Pesticides Manufacturing Unit at Butibori
Amendment in existing EC of Pesticides Manufacturing Unit located at Plot No. G-54, MIDC Butibori Industrial Area, District Nagpur, Maharash...
Solid Waste Management and Disposal Facility at Gauchar
The environmental clearance is sought for Municipal Solid Waste Management and Disposal Facility at Nagar Palika Parishad, Gauchar....
Premier Explosive Set to Establish Rs 864 Crore Defence Explosives Plant in Rayagada, Odisha
Premier Explosive plans to setup a defense explosives plant in Rayagada, Odisha. The Odisha state level single window clearance authority (S...
Redevelopment project at Kandivali
The environmental clearance is sought for the proposed Slum Redevelopment of property bearing at C.T.S. No. 467 [pt], 468 [pt] ,469 [pt] ,47...
Expansion of existing Software Technology Park at Thiruvallur
The company is seeking environmental clearance for the proposed expansion of existing Software Technology Park with additional construction...
Granite Mining Project at Lasariya village
The environmental clearance is sought for the proposed Granite Mining Project, at No.-26/2021, Area- 2.3158 Ha, Near village-Lasariya, Tehsi...
Construction of high rise building at Padur village
The environmental clearance is sought for the Construction of high rise building at Padur and Puduppakkam village, comprising Tower A, B, C...
Installation of DG set in Armed Police Brigade, Barrackpore
Construction of Sub-Station, Driveway, Lined Canal, Underground Reservoir, Driveway with street light and installation of DG set in Armed Po...
Amendment in EC of Integrated sugar complex with 5000 TCD sugar plant at Tumkur village
Amendment in environmental clearance of Integrated sugar complex with 5000 TCD sugar plant, 24 MW Co-gen Power Plant and Distillery Plant of...
Jakson Green Secures 100 MW Solar PV Plant Project in Rajasthan
Jakson Green clinches a power purchase agreement (PPA) with Rajasthan Urja Vikas Nigam Limited (RUVNL) for a 100 MW solar photovoltaic (PV)...
Bridge over Brahmaputra connecting Bharalumukh to North Guwahati
Construction of Bridge over the river Brahmaputra connecting Bharalumukh (Panbazar) to North Guwahati. The environmental clearance is sought...
O&M of Ground Mounted/ Floating Solar PV Power Projects of CIL
Request for expression of Interest for Empanelment of EPC-cum-O&M Contractors for development and O&M of Ground Mounted/ Floating Solar PV P...
Annual contract of repairing work IN-SITU position of big valves in Boiler
Annual contract of repairing work IN-SITU position of big valves in Boiler and turbine area of unit 1 to 4 at CTPP, RVUNL, Chhabra. The...
Research lab for snake venom antiserum in Noida’s Medical Device Park
Vince Bioproducts Limited plans a research lab for snake venom antiserum in Noida's Medical Device Park, requiring an investment of ?10-15 c...
VinFast Invests Rs 16,000 Crore in EV Plant in Tamil Nadu
VinFast, a leading Vietnamese electric car manufacturer, commences construction of its factory in Sillanatham, near Tuticorin with the SIPCO...
Kesar High Street project at Borhadewadi village
The environmental clearance is sought for the proposed expansion of Residential & Commercial Project named Kesar High Street, located at Bor...
