Advanced Cooling Water Treatment at PNC Panipat
Annual Rate Contract (ARC) for advanced cooling water treatment, specifically involving ClO2 dosing for various cooling towers including Process CT-I, Process C...
Gola Muri Road Widening to Four Lane – 25.163 Km
Widening, Strengthening and Reconstruction to four lane of Gola Muri Road (MDR-024) (Approximate Length-25.163 Km.). The bid due date is 22-Aug-2024. Tender ID:...
Railtel Secures Contract for Upgrading IT & Non-IT DC Infrastructure at WBSDC Monibhandar
Railtel has secured a contract from Webel Technology Limited for the upgradation and enhancement of existing IT and non-IT data center infrastructure at WBSDC M...
Order Secured for Multi-Channel ECG Machines
Bagged an order from DG Armed Forces Medical Service (Ministry of Defence) for Product named Portable Light Weight Computerized Multi Channel ECG Machine with C...
500 kWp Captive Solar Power Plant at Omkareshwar Power Station
A 500 kWp captive solar power plant is planned for implementation near Hanuman Mandir at Omkareshwar Power Station. The bid submission deadline is August 1,...
RCF Awards Contract to M/s Topsoe A/s for Ammonia Plant Revamp
RCF has awarded a contract to M/s Topsoe A/s for the procurement of Basic Engineering Design Package (BEDP) and Supply of Proprietary Equipment and Catalyst...
Supply and Installation of Data Logger for Solar Plants in Port Blair
A tender is open for the supply, installation, testing, and commissioning of data loggers and remote and local monitoring systems across various sites of 1...
Authority Engineer Consultancy for NG 01 and NG 02
Tenders are invited for consultancy services for an Authority Engineer for the construction of NG 01 and NG 02 packages, as part of Nagpur-Gondia Expressway,...
IRCON JV Wins Railway Project in Uttarakhand
IRCON International announced that its joint venture, IRCON-PARAS-PCM, has secured a contract from Rail Vikas Nigam. The project involves the design, supply, i...
Mau Junction Railway Station Set for Redevelopment Under Amrit Station Scheme
The Mau Junction Railway Station, located on the Varanasi-Gorakhpur railway section within the Varanasi division of North Eastern Railway (NER), is undergoing a...
Seismic Data Acquisition in Rajasthan and Ganga Punjab Basins
Hiring of Services for 2D Seismic Data Acquisition of 4300 LKM in Rajasthan Basin i.e Area-1 and 5100 LKM in Ganga-Punjab Basin i.e. Area-2 under...
Missing Link 4-Lane Construction, NH-503A
Construction of Missing Link from Birhu to Lathiani into 4-Lane and paved shoulder configuration from Km 35.550 Design Chainage 0.000 to 42.800 Design Chainage...
SDM Office Building Construction at Agartala
Construction of Sadar Sub-Divisional Magistrate (SDM) office building at Agartala under R.D. Agartala Division, West Tripura during the F.Y. 2024-25. The bid du...
Municipal Solid Waste Management Facility Planned in Naugaon, Uttarakhand
Environmental clearance is sought for the establishment of a Municipal Solid Waste Management and Disposal Facility with a capacity of 5 TPD (maximum) for the...
Installation of New Lift at Vidyut Sadan, DHBVN Hisar
Tenders are invited for the supply, installation, testing, and commissioning (SITC) of a new lift near the MD office in Vidyut Sadan, DHBVN Hisar. The...
CCTV Security System for Varanasi Airport Residential Colony
Provision of CCTV /Security system for residential colony at LBSI Airport Varanasi. The bid due date is 26-Aug-2024. Tender ID: 2024_AAI_203260_1....
GMDA Plans ?247 Crore Water Treatment Capacity Expansion at Basai,
GMDA plans to enhance water treatment capacity at Basai with a new 100 MLD (Million Litres per Day) unit. The project, costing ?247 crore, will...
Toyo Engineering Secures Contract for HIPS Line Expansion
Toyo Engineering has bagged a contract from Styrenix Performance Materials Limited for engineering consultancy services for the brownfield expansion of a new HI...
Clearance Sought for Residential and Commercial Project in Kolhapur
Environmental clearance is requested for the proposed residential and commercial development project at C.S. No. 24 B, E Ward, Tarabai Park, Kolhapur, Maharasht...
Faalcon Concepts Wins Order from Maconns Infra
Faalcon Concepts Limited has received a new order comprising Glass, Glazing & windows work from Maconns Infra Private Limited for their location at G-22, Ground...
Offshore Drilling Project in the AN-OSHP-2018/2 Block at Andaman Basin
Oil India Limited (OIL) is seeking CRZ clearance for the proposed offshore drilling of four exploratory wells in the AN-OSHP-2018/2 Block at Andaman Basin, Anda...
Hydrographic Survey for National Waterway No. 2
The project involves conducting a detailed hydrographic survey from Telibari (Ch. 548.5 km) to Neamati (Ch. 629.3 km) along National Waterway No. 2. The bid...