4-Lane Highway Construction Project in Andhra Pradesh
Construction of a 4-lane access-controlled highway from Vakalapudi Lighthouse to Annavaram on NH-16, section of NH-516F, from Km 0.000 to Km...
Independent Engineer for Surat Nashik Ahmednagar Solapur Stretch Package XIII
Consultancy services for Independent Engineer for Construction of Six Laning of Surat Nashik Ahmednagar Solapur MH/KNT Border Greenfield stretch Package -XII an...
IE for Six-Laning Surat-Nashik-Ahmednagar-Solapur Stretch (Package-1)
Consultancy services for Independent Engineer for Construction of Six Laning of Surat Nashik Ahmednagar Solapur MH-KNT Border Greenfield stretch Package-1 in th...
Gwalior 4-Lane Western Bypass Construction Underway
Construction of a 4-lane Western Bypass of Gwalior from Km 0.000 to Km 28.800 in Madhya Pradesh on an EPC mode under the NH(O) scheme....
Empanelment of Consultants for Land Acquisition in NHAI Projects
Empanelment of Consultants for Land Acquisition in NHAI Projects across India. The bid due date is 03-Oct-2024. Tender ID: 2024_NHAI_207129_1....
Consultancy for O&M of Thanjavur-Trichy NH Section in Tamil Nadu
Consultancy Services for Supervision Consultants of Operation and Maintenance of Four Laning of Thanjavur to Trichy section from Km 80.000 t...
Supervision and Construction Services for NH 530B in Uttar Pradesh
IE services for the supervision of the 4-lane highway from Chandan Nagar to the Bareilly Bypass section of NH 530B in Uttar Pradesh under th...
Consultancy for 4-Laning Supervision of Sultanpur-Varanasi NH-56
Supervision Consultancy Services during O&M stage and Construction stage of 4 Laning of Sultanpur to Varanasi Section of NH-56 Package I and...
NHAI Seeks Consultants for 6-Lane NH-316 Project from Bhubaneswar to Puri
Consultancy Services for Preparation of Detailed Project Report for Widening of existing 4 lane to 6 Lane (with 2 Lane Service roads on each...
IE for Six-Laning Surat-Nashik-Ahmednagar-Solapur Stretch (Package-2)
Consultancy services for Independent Engineer for Construction of Six Laning of Surat Nashik Ahmednagar Solapur MH/KNT Border Greenfield stretch Package 2 in th...
DPR Consultancy for Hyderabad-Bengaluru High-Speed Corridor
Consultancy services to prepare a Detailed Project Report (DPR) for the development of the Hyderabad-Bengaluru high-speed corridor. This project falls under the...
Grade Separators and Service Roads at Veerasandra Junction
1. Construction of grade separators along with service roads at four-lane VOPs at Veerasandra Junction at Chainages 19.395 and 19.465. 2. Four-lane VOP at Old...
NH48 Six-Lane Improvement in Haryana on EPC Mode
Construction of additional structures, improvement of service roads, and maintenance of the six-lane Gurgaon-Jaipur section of NH48 (formerly NH-8) between km 4...
Construction of STRR NH 948A: Somakkanamutta to Kunigal
Construction of STRR NH 948A Somakkanamutta (Magadi Taluk) to Kunigal (Ramanagara Taluk) from km 46.300 to km 79.000 in Karnataka on HAM. Project Length: 32.70...
Service Roads and Junction Improvements at Kuthiran and Athani Jn
Construction of Service Roads and widening of Main Carriageway at Kuthiran (Km.246.750 to Km. 247.020 RHS), Junction Improvement at Athani Jn (from Km 323.920 t...
Four-Lane NH-139W Expansion in Bihar on HAM Mode
Construction of a four-lane section of NH-139W from Sahebganj (Design.Ch.Km 44.650) to Areraj (Design.Ch. Km 82.200) in Bihar. The project will be executed on H...
Consultancy for DPR on Kuppam-Hosur-Bengaluru Greenfield Highway
Consultancy Services of Preparation of DPR for development of 4-lane greenfield highway from Kuppam-Hosur-Bengaluru (STRR) in the State of A...
Construction of 6-Lane Greenfield Corridor and NH Widening in Bihar
Authority Engineer for Construction of a 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH 119D (from Km 109.700 to Km 122.300), including the wideni...
Improvement of Kundapur to Surathkal section
Improvement of Kundapur to Surathkal section and Nantoor to Talapady section of NH66 by Construction of 1 nos. of VUP with Retaining wall approaches, Service...
IE for Six-Laning Surat-Nashik-Ahmednagar-Solapur Stretch (Package-3)
Consultancy services for Independent Engineer for Construction of Six Laning of Surat Nashik Ahmednagar Solapur MH-KNT Border Greenfield stretch Package-3 in th...
Supervision for Northern Patiala Bypass Construction in Punjab
Independent Engineer (IE) services to supervise the construction of a four-lane Greenfield Northern Patiala Bypass, extending from Km 274.115 of NH7 near Wazidp...
Four-Lane Spur Connectivity from Kishanganj-Bahadurgan
Independent Engineer (IE) services for the construction of a four-lane spur connecting NH-27 and NH-327E from Kishanganj-Bahadurganj in Bihar. The project spans...
