Environmental Clearance Sought for Comprehensive Steel Production Expansion
The environmental clearance is sought for the proposed expansion by Installation of 4.0 MTPA Pellet Plant, 0.84 MTPA Blast Furnace, 0.4 MTPA Coke Oven, 670...
Construction Work and Structure of Main Canal at Dargavan
On Turnkey Basis:- Construction of canal work and structures of main canal and its minor and sub minor iqcluding VRB of Spill channel crossing of...
Multi-Storeyed Residential Apartment Buildings in Coimbatore
The proposal involves construction of Multi Storeyed Residential Apartment Buildings with a total built-up area of 32,466.50 Sqm at Coimbatore. It includes four...
NOCIL Limited Approves Rs 250 Crore Capex for Capacity
NOCIL Limited's Board of Directors has sanctioned a capital expenditure of up to Rs 250 crore for expanding capacity in rubber chemicals at Dahej. Presently...
Common Biomedical Waste Treatment Facility at Kanoli
Application for Validity Extension of EC for the proposed Common Bio Medical Waste Treatment Facility (CBWTF), located at Khata No. 00001 (Basra No. 40) &...
DPR for study of landslide area on various locations in Nagaland
Consultancy services for preparation of DPR for study of landslide area on various locations between Chainage km 172.900 to km 182.000 along NH-39 (New NH-29)...
Warehouse Construction in Ahmednagar
Construction Of Warehouse And Processing Shed 6550 Sq. Ft at Ahmednagar. The bid due date is 10-Apr-2024. Tender ID: 2024_DOAWB_1037519_1....
Dredger Hiring at Naval Dock Yard
Hiring of Dredgers on Cubic Meter basis for the work of carrying out Maintenance dredging of Naval sites at Naval Dock Yard (NDY) Mumbai. The...
Establishment of 100 KLD Grain-Based Ethanol Plant at Vadugappatti
The environmental clearance is sought for the proposed establishment of 100 Kld capacity of grain based ethanol plant and 4.2 MW Cogeneration Power Plant at...
Road Maintenance for Muzaffarnagar-Haridwar Four Laning Project
Urgent work of Repair maintenance at risk and cost of Contractor in project Four Laning of Muzaffarnagar- Haridwar Section of NH-58 from Km.180.300 to Km...
L&T Wins Contract for Solar Glass Plant in Gujarat
L&T has secured an order for the construction of a Solar Glass Manufacturing Plant in Gujarat. The project scope includes civil, structural, and architectural w...
Samved Opera Project Progressing in Gandhinagar
The environmental clearance is sought for Samved Opera project. It's a Residential plus commercial construction project, located at Gandhinagar, Gujarat....
Fire Alarm System for New Multistoried Godown at State Warehouse Muthalamada
Supply, installation, testing and commissioning of fire fighting and fire alarm system for New Multistoried Godown at State warehouse Muthalamada in Palakkad Di...
Maharashtra State Power Orders 100 MWAC Solar Project
KPI Green Energy Limited secures order for 100 MWAC solar project from Maharashtra State Power Generation Co. Ltd....
Arrjavv Builder Seeks Environmental Clearance for Residential Project in Kolkata
Arrjavv Builder Private Limited is pursuing environmental clearance for a proposed residential building at Premises No. 2, Bright Street, Ward No. 65, Borough -...
Construction Work of Suhawa Barage Scheme
Construction work of Suhawa barage scheme on turnkey basis. The bid due date is 19-Apr-2024. N. l.T. No. 1055/2023-24/E-in-C/e-tendering...
Thermax Plans High-Ash Coal Gasification in Eastern Region
Thermax Ltd engages with steel companies in the east for high-ash coal gasification project, a first in the region. Discussions are underway with Coal India...
400KLD Capacity Sewage Treatment Plant in Guntakal
Operation and Maintenance of 400KLD capacity Sewage treatment plant in North colony at Guntakal for a period of 12 months. The bid due date is...
Avaada Energy’s Subsidiary to Supply Electricity to Gujarat with 421 MW Solar Project
Avaada Inclean, an arm of Avaada Energy, signs pact with Damodar Valley Corporation to supply electricity in Gujarat. Plans are underway for a 421 MWp...
Patratu Super Thermal Power Project Phase-I (3×800 MW)
The environmental clearance is sought for 3x800 MW (Phase-I) Patratu Super Thermal Power Project at Patratu District Ramgarh, Jharkhand....
Development of Warehousing Facility in East Zone
Development of the Warehousing Facility Through Ppp Under Dbfot Model in East Zone. The bid due date is 30-Apr-2024. Ref: CWC CO-CD0COMM/24/2022-CoMM....
L&T Construction to Build Polymer Plant in Gujarat
L&T Construction has been awarded a contract from a subsidiary of a prominent Paint manufacturing company to construct a polymer manufacturing plant in Gujarat....