Balance Work of Datana to Nagjhir Road
Construction of balance work of Datana to Nagjhir road (1.70 km) in Division Ujjain. The bid due date is 25-Ap...
Open Type Bandhara at Kamarkhand in Dharbandora Taluka
Construction of Open Type Bandhara at Kamarkhand in V.P. Kirlapal Dabal of Dharbandora Taluka. The bid due dat...
Maintenance of DG Sets at AFS Kanpur
Comprehensive maintenance of DG Sets of Domestic area and semi Domestic area at AFS Kanpur. The bid due date i...
Road Project from Jog Khedi to Gondi Jod
Construction of Jog Khedi to Gondi Jod road (3.25 km) including pole shifting under Sub Division Shujalpur. Th...
Open Type Bandhara at Bindidevane in Sanguem Taluka
Construction of Open Type Bandhara at Bindidevane in V.P Netorlim in Sanguem Taluka. The bid due date is 25-Ap...
Dispensary Building and Recharge Well in Panchkula
Construction of Dispensary Building (Ground floor) and recharge well in Sector-28, Panchkula including public...
Road Works from Sukalya to Dehrighat and Farad School
Construction of Sukalya to Dehrighat road (2.587 km) and Farad Higher Secondary School road (2.48 km), total l...
Rebid for Canal Crossing Structure on NH-30 in Madhya Pradesh
Reinvitation of bid for Construction of Canal Crossing Structure below the Constructed Highway along with serv...
Electrical Works for Critical Care Block at GH Pathanamthitta
Construction of Critical Care Block at GH Pathanamthitta including electrical works. The bid due date is 25-Ap...
O&M of STP, WTP, ETP, and RO at Debra and Belda SSH
Comprehensive maintenance contract of the Sewage Treatment Plant STP Water Treatment Plant WTP Effluent Treatm...
Concrete Lining Work in Kuanria Irrigation Project Canal
Cement Concrete Lining in Right Distributary of Kuanria Irrigation Project from RD.11.00 Km to 18.20 Km. The b...
Supply and Installation of Online UPS Systems and Battery Banks
e-Tenders are invited for the supply, installation of online UPS systems, and battery banks with buyback of ol...
Rooftop Solar PV System Project of 47 KWP
Designing, Supply, Installation, Testing Commissioning and operation and maintenance for 5 Years 47 KWP grid c...
Mini Stadium Construction at Berinag, Pithoragarh
Construction work of mini stadium in Berinag, Pithoragarh district. The bid due date is 25-Apr-2025. Tender ID...
8 Passenger MRL Lift at Excise and Taxation Building
SITC of 03 No G Plus 4, 08 Passenger MRL Lift with Two Years CMC post 01 Year DLP at Excise and Taxation Build...
Inspection Services for STPS Sarni Units PH 24
Testing and inspection of pressure vessels, EOT crane, passenger cum goods lift, and lifting tackles for phase...
Mini Stadium Project at Pothing, Bageshwar District
Construction work of mini stadium in Pothing of Bageshwar district. The bid due date is 25-Apr-2025. Tender ID...
Elevator Works at GH Pathanamthitta Critical Care Block
Construction and installation of elevators for the Critical Care Block at General Hospital, Pathanamthitta. Th...
2.0 MLD WTP Construction under AMRUT 2.0 at Bathinda
Canal Water Based Water Supply Project for Construction of 2.0 MLD Water Treatment Plant (WTP) and other relat...
3rd Party Monitoring and Quality Control for ROB Construction in Nalbari
Third Party Monitoring and Quality Control services are needed for the construction of the ROB at Bridge No.50...
Fire Fighting System at 50 Bedded Civil Hospital in Sohna
Fire Fighting System at 50 Bedded Civil Hospital at Sohna in Gurugram District. The bid due date is 25-Apr-202...
Consultant Appointment for Water Amusement Park at Sendhwa
Appointment of architect and PMC consultant for development of Water Amusement Park and allied infrastructure...
