Consultancy for Improvement of 84 Kosi Parikrama Marg
Consultancy services for Authority's Engineer to supervise the improvement and upgradation from Km 73.300 (Bikapur) to Km 140.960 (Patranga)...
Shiv Shaligram Celestial Project Launched in Ahmedabad
Environmental clearance is sought for proposed project Shiv Shaligram Celestial at F.P.No.: 92/2, O.P.No.: 92/2, T.P.S. No.: 45 (Chandlodiya...
Upgradation of BSNL Office to Railway Crossing in Bhandara City
Upgradation of BSNL Office to Railway Crossing in Bhandara City from Chainage Km 168/180 to Km 168/920 (Length 0.740 Km) of NH-247 to Two La...
Grain-Based Ethanol Manufacturing Facility Proposed in Rohtak
Aravalli Biofuels is seeking environmental clearance for the proposed manufacturing of grain-based ethanol with a capacity of 30 KLD and a b...
Construction of Grade-Separated Structure VUP on Ajmer-Nagaur Section
Construction of a grade-separated structure (VUP) on the Ajmer-Nagaur section of NH 89 (New NH-58) at three locations: KM 3/630 (Kayad), KM...
Authority Engineer Services for Nandur Shingote-Kolhar Section
Authority Engineer Services for consultancy and supervision of the strengthening, upgradation, and widening of the Nandur Shingote - Kolhar...
Hydra Cranes Hiring Contract Announced
Annual Contract for Hiring Hydra Cranes on an and when required Basis. The bid due date is 25-Nov-2024. Tender Id: 2024_dps_832169_1....
Drainage Construction on Washim Dastapur Karanja Road
Construction of Box Drain and CC Drains on Washim Dastapur Karanja road NH 161E at Pusad Naka Dist Washim in the state of Maharashtra under...
Upgradation of Amgaon-Gondia NH-543 to Two-Lane
Balance work of Up-Gradation of Amgaon-Gondia, National Highway 543 in Km 24/985 to 27/025, 32/130 to 34/088 & 39/475 to 41/625 [Design Km 5...
Swapna Developers Proposes Residential-Commercial Complex in Margao, Goa
Swapna Developers has proposed the construction of a residential cum commercial complex on property bearing Chalta No. 21, 25, 41, and 51 of...
Reconstruction of Major Bridges at Bav and Anjanari on Mumbai-Goa Highway NH-66
Reconstruction of sub-standard weak Major Bridge at Bav Km 117.110 and Major Bridge at Anjanari Km 143.500 on Mumbai Goa Highway NH.66 in Ka...
Commercial Project with 108 Units in Vastrapur Seeks Environmental Clearance
The environmental clearance is sought for a proposed commercial project at Survey No. 198/1, F.P. No. 102 of [O.P. No.: 102, Draft TPS No. 3...
Reconstruction of Substandard Major Bridges in Aravali-Kante Section on NH-66
Reconstruction of the substandard Arawali Major Bridge at Km 70.865, the Service Road Bridge at Sangmeshwar, and the Main Carriageway Bridge...
JSW Green Mobility to Invest ?27,200 Crore in New Electric Vehicle Plant
JSW Green Mobility has been allocated 636 acres of land in the Bidkin node of AURIC city for an electric vehicle manufacturing plant, set to...
Rehabilitation of 4-Lane Barshi Takli Bypass (NH-161A)
Rehabilitation and Upgradation of 4 lane road with paved shoulders of Barshi Takli Bypass (NH 161 A) from Design km. 0.000 to km.3.160 (Tota...
Aim Moulding Spares Plans New Production Unit in West Bengal
Aim Moulding Spares plans to manufacture lighting and signaling products, including aviation obstruction lamps and traffic signal lights, wi...
Upgradation of Nashik Peth Road NH-848 in Ghat Section
Upgradation of Nashik Peth Road NH No 848 in Ghat Section of Forest Length (Km 38-970 to Km 41-816 and Km 49-730 to Km 51-413)...
JSW Group Aims for 50 GWh Battery Manufacturing Facility by 2030
JSW Group is set to establish a battery manufacturing facility with a capacity of 50 GWh by 2028-2030, following its recent acquisition of a...
Rehabilitation and Concreting of Kalyan-Nirmal Road
Rehabilitation and upgradation by concreting to 2LPS of Kalyan-Nirmal Road from design Km 37-850 to 57-900 of NH-61 in Thane District in the...
Construction of LHS and Approaches over Rewari-Sardulpur Rail Line
Construction of LHS and its approaches in lieu of level crossing No.C-124 over Rewari-Sardulpur Railway line crossing NH-709 (Extn.) in Loha...
Curve Improvement at Bhosate Ghat on NH-66
Rectification of Black spot and Curve improvement of Bhosate Ghat turn on Mumbai Goa NH-66 in Km 180.550 to km 181.950 And other road safety...
2-Lane Paved Shoulder Project on NH-548CC in Maharashtra
Widening to 4 lane with road side drain in Udaynagar village and construction of 2LPS from section 94.600 to 65.100 on Chikhali Khamgaon NH5...
