Maintenance of Elevator at Agartala Secretariat
Comprehensive Annual Maintenance Contract (CAMC) for one Thyssenkrupp make 10-passenger lift Model M 4005 installed at Block 1 of New Secretariat Buil...
Consultancy for AE Supervision on NH-419 in Jharkhand
Consultancy Services for Authority Engineer (AE) for supervision of construction of 2-lane with paved shoulder...
Fire Reservoir and Pump Room Works at Netaji Indoor Stadium, Kolkata
Construction of new fire reservoir and fire pump room with allied works and refurbishment of existing fire fighting network at Netaji Indoor Stadium,...
Dada J. P. Vaswani Complex to Add School and Dispensary Buildings
Dada Shyam Foundation has sought environmental clearance for the construction of school, dispensary, and ashra...
Authority Engineer Services for Giridih Bypass in Jharkhand
Consultancy services for Authority Engineer supervision of construction of a bypass around Giridih town of NH-...
50 Bedded Field Hospital at Kanchanpur
Balance Work for the Construction of 50 Bedded Field Hospital at Kanchanpur Sub Division Under R.d. Kanchanpur Division During the Year 2025-26. The b...
Sponge Iron and Rolling Mill Expansion Proposed in Purulia
Environmental clearance is sought for expanding sponge iron production capacity from 33,000 TPA to 66,000 TPA,...
Authority Engineer Consultancy for Four-Lane Road in Kerala
RFP for Consultancy Services as Authoritys Engineer for Construction of Four Lane Road for New Road connectivi...
Ayurvedic Hospital at Chaurlekh, Nainital
Construction of Ayurvedic Hospital building at Chaurlekh, District Nainital. The bid due date is 09-Oct-2025. Tender ID: 2025_MDPEY_87545_1....
Electrosteel Castings to Manufacture Water Valves in India
Electrosteel Castings (ECL) plans to set up an R&D centre and a manufacturing facility in India for precision...
Widening and Strengthening Works Proposed for NH-116B in West Bengal
Widening and strengthening to two-lane with paved shoulder from Km 25.50 to Km 41.00 of National Highway (NH)...
CMC of HVAC Systems at KCGMC Karnal
Comprehensive Maintenance Contract of Heating, Ventilation and Air Conditioning (HVAC) at Kalpana Chawla Government Medical College (KCGMC), Karnal. T...
Four-Lane Access-Controlled Highway Proposed from Cuttack to Kandarpur
Environmental clearance is sought for the Construction of new four-lane Access controlled Highway from Cuttack...
Shriram Properties Plans Rs.500 Crore Housing Project in Bengaluru
Shriram Properties enters a JDA for a 6.5-acre land parcel in Yelahanka, Bengaluru, to develop premium apartme...
Website Development and Maintenance for Lucknow Solar Power Development Corporation
Designing, hosting, maintenance and updation of website on annual basis for Lucknow Solar Power Development Corporation Limited, Uttar Pradesh. The bi...
Greenfield Distillery and Power Project Proposed in Khagaria
Environmental clearance is sought for the Greenfield Project of 175 KLPD grain based distillery along with 4.5...
BHVL to Develop Six Marriott Hotels Across South India
Brigade Hotel Ventures has signed agreements with Marriott International to develop six hotels with 940 rooms...
Green Bio Methanol Plant at Gandhidham
Design, supply, installation, testing and commissioning of 5 Tonnes Per Day (TPD) Green Bio Methanol Plant on Engineering, Procurement and Constructio...
Industrial Park Planned on 1,109 Acres in Krishnagiri
Environmental clearance is sought for the development of an industrial park across 449.155 hectares (1,109.41...
Deepak Fertilisers Revises Gopalpur TAN Project Cost to Rs.2,675 Crore
Deepak Fertilisers has revised the cost of its Technical Ammonium Nitrate (TAN) project at Gopalpur to Rs. 2,6...
Drainage and Sewage Treatment Works at Sangli Civil Hospital
Underground drainage scheme and treatment plant and sewage treatment plant for Padmabhushan Vasantdada Patil Civil Hospital, Sangli, Taluka Miraj, Dis...
Titagarh Rail Allocated 40-Acre Plot in Uttarpara
The West Bengal cabinet has approved the handover of a 40-acre land parcel in Kotrung and Bhadrakali areas of...
