Augmentation of Existing Barshi Water Supply Scheme
Augmentation of Existing Barshi Water Supply Scheme From Ujjani Dam - Phase Ii,dist Solapur Under Amrut 2.0. The bid due date is 04-Mar-2024...
Environmental Clearance Request for The Orizzonte Expansion Project in Sus, Pune
The company is seeking environmental clearance for the proposed project named - The Orizzonte. The Project is an expansion in existing EC Pr...
Environmental Clearance Application for Commercial Building in Wagle Estate
Application for Environmental Clearance for the proposed Commercial Building Project on plots bearing No. C-6, Wagle Estate, Thane, State ...
Major upgradation of Gurugram railway station
Major upgradation of Gurugram railway station including air concourse on modular concept on engineering, procurement and construction mode....
1500 MW ISTS connected Wind Solar Hybrid Power Projects in India
Selection of Hybrid Power Developers for setting up of 1500 MW ISTS connected Wind Solar Hybrid Power Projects in India under Tariff-Based C...
Automatic Fare Collection System for Navi Mumbai Metro Line-1 Network
Design, Manufacture, Supply, Installation, Testing and Commissioning of Automatic Fare Collection (AFC) System for Upgradation of existing N...
Mega risk insurance policy alongwith other policies for RVUN power station
Mega risk insurance policy alongwith other policies for RVUN power station from PSU insurer. The bid due date is 01-Mar-2024. Tender ID: 20...
Fire fighting system at SLDC Nayagaon
Installation of fire fighting system at SLDC Nayagaon, Jabalpur. The bid due date is 04-Mar-2024. Tender ID: 2024_MPPTC_332808_1....
S M Labs Seeks Clearance for Significant Expansion in Drug Manufacturing
S M Labs is seeking environmental clearance for the proposed expansion of existing Drug Intermediate manufacturing unit to Bulk Drugs & Drug...
Repair/ Rectification for 02×1500 KVA Cummins make DG Sets at Konnectus
Repair/ Rectification for 02x1500 KVA Cummins make DG Sets installed at Konnectus Tower, New Delhi including 5 Year AMC Contract with 2 Comp...
Tamil Nadu Cements Corporation Plans 20 MW Solar Project at Alangulam
TANCEM has invited bids from consultants to prepare a detailed project report for a 20 MW solar power project at Alangulam Cement Works in V...
Project Management for Sewerage Improvement in Indore Municipal Corporation
Request For Proposal for Project Management Consultancy Services for Sewerage Improvement Works including Construction and O&M of Sewerage T...
Development of Sports Complex at Ghahigaon
Consultancy Services for the development of Sports Complex at Ghahigaon under Gohpur LAC (Part-II). The bid due date is 26-Feb-2024. Tender...
Synthetic Resin Production Plant at Biswanathpur
The environmental clearance is sought for the proposed Synthetic Resin Production Plant (PF Resin, UF Resin & MF Resin) at Mouza-Biswanathpu...
Construction of Shopian Bypass on NH444
Construction of Shopian Bypass on NH444 taking off from existing ch. Km 36.500 and rejoining at Km 47.588 of existing chainage New Design Ch...
Kanpur Kabrai Project
Development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala...
2 MW solar power project contract from Shree Varudi Paper under CPP segment
Bagged a new order from Sanwariya Processors Private Limited for 2 MW for executing solar power project under Captive Power Producer (CPP) S...
Improvements to existing water supply scheme for Kancheepuram
Improvements to existing water supply scheme for Kancheepuram City Municipal Corporation Package I. The bid due date is 28-Feb-2024. Tender...
Command Area Development for Lakdi-Nimbodi Lift Irrigation Scheme in Pune
Command area Development under Lakdi- Nimbodi Lift Irrigation Schemes having 11154 Ha CCA, A/P Kumbhargaon, Taluka Indapur, District Pun...
Expansion Project: Manufacturing of Synthetic Organic Chemicals in Jhagadia
The environmental clearance is sought for proposed expansion unit at Plot No. 26/B, Jhagadia Notified GIDC Industrial Estate, District: Bhar...
Redevelopment of Staff Quarters in Malad East, Mumbai
The proposed project involves the redevelopment of Staff Quarters (Class IV) situated on plot no. 581A/26 at Malad Phase-I, Raheja Township,...
Construction of new building at BHU Varanasi
Construction of new building (G plus 4) and renovation of existing building of Aiyer Boys Hostel at BHU, Varanasi including water supply, sa...