CCTV System for Surveillance at 765kv Kanpur Gis Substation
Supply, installation, testing and commissioning of Security CCTV System for Surveillance Along the Boundary Wall and Store Areas at 765kv Ka...
Construction of Saidapet Commercial Complex
Detailed Design and Construction of Saidapet Commercial Complex comprising of Stilt Parking 2 Upper Floors, Architectural, Structural, MEP W...
Provision of On grid Solar power plant at 20 stations over Prayagraj
Provision of On grid Solar power plant and off grid Solar power plant at 20 stations over Prayagraj Division. The bid due date is 15-Mar-202...
Installation of Induction furnace at Kharagpur
The environmental clearance is sought for the proposed expansion by installation of Induction furnace (5 x 25 T) with matching CCM for produ...
Hiring of Consultancy Firm for conducting Topographic survey in Nainital
Hiring of Consultancy Firm for conducting Topographic survey Geological Investigation, Geotechnical investigation,Geo-physical Investigation...
AMC for 125 kva DG Set at Bengaluru
AMC for 125 kva DG Set (S No.62579311), 250 kva DG Set (S No.25757489) and 320 kva DG Set (S No.25267069). The bid due date...
Consultancy and Construction Supervision Services for Jharsuguda
Appointment of Architect for Architectural Consultancy and Construction Supervision Services for Jharsuguda and Jajpur. The bid due date is...
Supply of material handling equipments at Varkute
Supply, installation, testing and commissioning of Material Handling Equipments at Varkute (Bk), Loni Devkar, Indapur, Pune. The bid due da...
Preventive Maintenance and Repairs to Boiler at Pune
85891: Preventive Maintenance and Repairs to Mechanical Laundry Equipment, Boiler and Other Misc Connected Work at New Chsc at Age Em-ii Und...
City Square Commercial Mall project at Jaipur
The environmental clearance is sought for City Square Commercial Mall and Hotel project, located at Jaipur, Rajasthan....
EC Sought for Residential and Commercial Project in Pune
The environmental clearance is sought for the proposed residential and commercial project at Survey no. 315/1B/2/2, Taluka-Haveli, Pune....
Skypark Construction Project Seeks Environmental Clearance
The environmental clearance is sought for the proposed Skypark construction project, located at survey No.704, O.P.No.162, F.P.No.162, TPS N...
Apraava Energy Wins Transmission Project in Madhya Pradesh
Apraava Energy has bagged greenfield interstate transmission project in Madhya Pradesh, secured through the Government of India's Tariff-Bas...
PMRDA Assures Timely Completion of Pune’s Double-Decker Flyover
PMRDA has reassured residents about the timely completion of Pune's double-decker flyover, a crucial component of the third Metro line. Sche...
Re-Rolling Mill Steel Plant at Mondalpur
The environmental clearance is sought for Re-Rolling Mill Steel Plant located at R.S. & L.R. Plot No. 2849, 2861, 2862/3380, Mouza-Mondalpur...
Fire Fighting System for Pandit Kanade Shastri School at Buldana
Providing Electrical Installation, CCTV, Fire Fighting System And Water Pump To UPSC/MPSC Competitive Exam Library Building For Education Pu...
Bidding for Establishing International Standard Educational Institute in Nagpur
Establishing, Developing, Operating and Maintaining an Educational Institute and University (or Off-campus Center of an Existing University)...
Installation of 250KVA DG and Stadium Lighting at Nehru Stadium
Supply, Installation, Testing and commissioning of 250KVA three phase DG with AMP Panel, Armoured cable and 630 amp Main Panel and stadium l...
Consultancy Services for the Office of CCE (RnD) Estates
Management Consultancy Services for the Office of CCE (RnD) Estates South, Hyderabad. The bid due date is 01-Mar-2024. Tender ID: 2024_DRDO...
Supervision of, Construction of Major Bridges on Wadigodri Ambad Jalnab section
Consultancy services for Authority's Engineer for Supervision of, Construction of Major Bridges at Ch 8 00 Ch 35 488 on Wadigodri Ambad Jaln...
Construction of Singheshwar Bypass on NH 131 106
Consultancy Services for Preparation of Detailed Project Report including LA and other clearances for Construction of Singheshwar Bypass on...
Construction of 6 Married Accomodation at Chimney Hills
Construction of 6 Married Accomodation at Chimney Hills. The completion is targeted in 9 months. The bid due date is 01-Mar-2024. Tender ID:...