Mega risk insurance policy alongwith other policies for RVUN power station
Mega risk insurance policy alongwith other policies for RVUN power station from PSU insurer. The bid due date is 01-Mar-2024. Tender ID: 20...
Fire fighting system at SLDC Nayagaon
Installation of fire fighting system at SLDC Nayagaon, Jabalpur. The bid due date is 04-Mar-2024. Tender ID: 2024_MPPTC_332808_1....
S M Labs Seeks Clearance for Significant Expansion in Drug Manufacturing
S M Labs is seeking environmental clearance for the proposed expansion of existing Drug Intermediate manufacturing unit to Bulk Drugs & Drug...
Repair/ Rectification for 02×1500 KVA Cummins make DG Sets at Konnectus
Repair/ Rectification for 02x1500 KVA Cummins make DG Sets installed at Konnectus Tower, New Delhi including 5 Year AMC Contract with 2 Comp...
Tamil Nadu Cements Corporation Plans 20 MW Solar Project at Alangulam
TANCEM has invited bids from consultants to prepare a detailed project report for a 20 MW solar power project at Alangulam Cement Works in V...
Project Management for Sewerage Improvement in Indore Municipal Corporation
Request For Proposal for Project Management Consultancy Services for Sewerage Improvement Works including Construction and O&M of Sewerage T...
Development of Sports Complex at Ghahigaon
Consultancy Services for the development of Sports Complex at Ghahigaon under Gohpur LAC (Part-II). The bid due date is 26-Feb-2024. Tender...
Synthetic Resin Production Plant at Biswanathpur
The environmental clearance is sought for the proposed Synthetic Resin Production Plant (PF Resin, UF Resin & MF Resin) at Mouza-Biswanathpu...
Construction of Shopian Bypass on NH444
Construction of Shopian Bypass on NH444 taking off from existing ch. Km 36.500 and rejoining at Km 47.588 of existing chainage New Design Ch...
Kanpur Kabrai Project
Development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala...
2 MW solar power project contract from Shree Varudi Paper under CPP segment
Bagged a new order from Sanwariya Processors Private Limited for 2 MW for executing solar power project under Captive Power Producer (CPP) S...
Improvements to existing water supply scheme for Kancheepuram
Improvements to existing water supply scheme for Kancheepuram City Municipal Corporation Package I. The bid due date is 28-Feb-2024. Tender...
Request for Additional Environmental Clearance for Redevelopment Project by Agnel Developers
Agnel developers have proposed redevelopment for EWS & MHADA at Pant nagar, Ghatkopar, Mumbai. The project has received EC from SEIAA vide l...
Kalaya Greens project is coming up at Undri
The environmental clearance is sought for Kalaya Greens project which is coming up with Undri village, Pune, Maharashtra....
Major Upgradation of Delhi Cantt Railway Station
Major Upgradation of Delhi Cantt Railway Station on Engineering, Procurement and Construction Epc Mode. The bid due date is 16-Apr-2024. Ten...
Master Concessionaires for Duty-Free Outlet at Land Port Agartala
Selection of Master Concessionaires to Develop, Build, Finance, Operate and Maintain the Duty-Free Outlets at Land Ports Agartala, Attari an...
Elevated Metro Viaduct construction in Reach 2B of NMRP Phase 2
Design and Construction of Elevated Metro Viaduct of length 5.9 km between Ch. (-) 7577.056 m to Ch. (-) 13457.046 m in Reach 2B of...
Construction of Industrial sheds for PMRP
Miscellaneous Works such as Construction of Industrial sheds Godown new buildings and Architectural Finishing Works MEP works Shifting of Ci...
Contract for FGD Works at NTPC Sipat Power Project
R A Enterprise has bagged a contract from BHEL for erection and commissioning of Unit 5 absorber, ducting, rotary, piping, insulation painti...
EC sought for expansion of API manufacturing unit at Ambhora village
The environmental clearance is sought for the proposed expansion of existing product capacities and addition of new products manufacturing o...
STT GDC India to undertake Data Centre Expansion in Tamil Nadu
STT GDC India has signed an MoU with the Tamil Nadu government to invest up to Rs 1,900 crore for expanding its data centre capacity...
Feasibility study of Co2 transportation and storage of Jaisalmer basin
Feasibility study of Co2 transportation and storage in Saline Aquifers / Reservoirs of Jaisalmer basin, Rajasthan. The bid due date is 26-Fe...
