Reru Bridge Construction Balance Work Tende
Execution of balance work under risk and cost tender for the design and construction of a 50 m single-span major PMT bridge (Reru Bridge) (through...
Vehicular Underpass Planned at Kudal Sangam
Construction of Vehicular underpass at Kudal Sangam cross at Km.305.446 Black spot ID KA 02 367 and VUP at Belgal cross at Km.307.151 Black...
Flyover and Junction Improvements on NH-67, Coimbatore
Construction of Flyover Including Junction Improvements from km 335/600 - 338/400 of NH 67 (Km 3/0 - 5/4 New NH 181) at Singanallur Junction...
Accident Spot Rectification at Lingampally X Road
Permanent rectification of Accident Spot at Lingampally X Road for construction of VOP at Km 463.138 on MH KNT Border to Sangareddy Section...
Six-Laning of Saharanpur Bypass to Ganeshpur Section
Construction of connecting road at BHS for six laning along with full access control provisions in stretches from Saharanpur bypass to Ganes...
Construction of Minor Bridge on Vadaliya Sinhan to Nagda Mahadeviya Road
Construction of minor bridge a ch. 4.350 km on Vadaliya Sinhan to nagda mahadeviya road, Khambhadia, Dist.- Devbhumi Dwarka. The bid due date is 05-Oct-2024....
Ongoing Work on 4-Lane ROB Construction for Anantapur – Dharmavaram Railway Section
Balance Work of Construction of proposed 4 lane ROB and its approaches in lieu of existing Level Crossing No.124E/SPL3 at Km 1.800 on NH 205...
Five Major Bridges Construction on NH-30 in Chhattisgarh
Construction of 5 Nos. Major Bridges at Km 88.200 Ful Chhindgarh River, Km. 122.600 Malger River, Km. 145.000 Penta Nalah, Km. 163.400 Errab...
Construction of 2-Lane Mantralayam Bypass in Kurnool Underway
Construction of Mantralayam bypass of 2 lanes with paved shoulders on NH 167 under NH(O) on EPC mode in Kurnool district of Andhra Pradesh S...
Site Grading and Roadworks for MRPL Bio-ATF Project
Site Grading and Road Works for execution of Bio-ATF project of MRPL. The bid due date is 14-Oct-2024. Tender ID: 2024_EIL_825600_1....
Tender Issued for Perimeter Road Construction at Birsi Airport
Construction of Perimeter Road along the newly constructed/ extended Runway towards RWY 22 end at Birsi Airport, Gondia. The bid due date is...
Civil and Architectural Works for NRL RT Site in Golaghat, Assam
E-tenders are invited for Civil and Architectural Works (Package-II) at the NRL RT site, Dist. Golaghat, Numaligarh, Assam. This includes PC...
Package-5 of Huri-Taliha section of NH-913 Road Construction
Construction of road from km 160.75 to km 209.90 (Package-5) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC...
Package-3 of Huri-Taliha section of NH-913 Road Construction
Construction of road from km 55.725 to km 113.250 (Package-3) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EP...
Construction of Concrete Roads in Athipattu Proposed
Construction of Concrete Roads in Athipattu Pudunagar under CSR works. The bid due date is 28-Oct-2024. Tender ID: 2024_NTECL_210683_1....
Package-4 of Bomdila-Nafra-Lada section of NH-913 Road Construction
Construction of road from km 113.00 to km 167.75 (Package-4) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane...
New 4-Lane Access Controlled Highway in Bellary
Access Controlled Highway of 4L with Paved Shoulder from DC 10.00 to DC 33.87 in Bellary Moka KNT/AP Border section of NH167 in Karnataka on...
Iconic Hybrid Cable-Stayed and Suspension Bridge Across Krishna River Planned
Tenders are invited for the construction of an iconic hybrid cable stayed and suspension bridge across the Krishna River on NH 167K, design...
Package-6 of Lada-Sarli section of NH-913 Road Construction
Construction of road from km 126.15 to km 168.00 (Package-6) of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC...
Access Controlled Highway from Mittimalkapur to Deosugur Proposed
Access Controlled Highway of 4L with Paved Shoulder from Mittimalkapur (DC 23.500) to Deosugur (DC 54.566) in AP/KN Border Raichur KN/TS Bor...
Road construction from Km 17.812 to Km 55.377 of Bile to Migging stretch
Construction of road from Km 17.812 to Km 55.377 of Bile to Migging stretch (Ch.0.0 at Migging) of NH-913 (Frontier Highway) to Intermediate...
Access Controlled Highway Planned from AP/KN Border to Mittimalkapur
Access Controlled Highway of 4L with Paved Shoulder from AP/KN Border (DC. 0.000) to Mittimalkapur (DC. 23.500) in AP/KN Border Raichur KN/T...
