Strengthening and Maintenance Works in Jetpur Somnath Section
Strengthening and maintenance works activities on section from Km 0.00 to Km 123.454 of Jetpur Somnath Section excluding Junagarh Bypass (103 Km) in the State...
Road Construction from km 81.40 to km 106.00 in Kharsang-Miao-Vijaynagar Section
Construction of road from km 81.40 to km 106.00 (Package-3) of Kharsang-Miao-Vijaynagar section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in...
Vehicle Underpass (VUP) Construction at Dadour
Construction of VUP at km 177.825 (Dadour) and km 182.040 (Nagchala) on Balance work of Kiratpur to Nerchowk section of NH 03 (from km 0.000...
Construction of Rewa Bypass as 4-lane with paved shoulder of NH-30
Construction of Rewa Bypass as 4-lane with paved shoulder along with service roads from the Ratahara Chowk to Chorhata Chowk Road section of NH-30 Design...
O&M of Highway Nest facilities-Amenities at Itaunja Toll Plaza
Engagement of Contractor for Operation and Maintenance of (04 No.) Highway Nest (Mini) facilities-Amenities at Itaunja Toll Plaza at Km. 467 and Khairabad Toll...
Construction of road from Kharsang-Miao-Vijaynagar section (Package-4)
Construction of road from km 106.00 to km 130.125 (Package-4) of Kharsang-Miao-Vijaynagar section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode...
Construction of Road Under Bridge (RUB) in Mysore Taluk
Construction of RUB in lieu of LC No 5 at Km 5 60 of MDR road Mysuru Belagola road in Mysore Taluk Mysore District. The...
Construction of Foot Over Bridges with Lift facility at Chengalpattu
Construction of Foot Over Bridges with Lift facility at 07 Nos of locations between Km 30.100 to Km 47.840 on Tambaram to Chengalpattu section of...
Rehabilitation and Upgradation of Injegaon to Pathari
Rehabilitation and Upgradation of Injegaon to Pathari, Borgavhan to Selu and Digras Phata to Deogaon Phata sections of NH 548 B to 2-4 LPS configuration...
Upgradation and Rehabilitation of Section of NH 361F Gangakhed to Loha road Package
Upgradation and Rehabilitation of Section of NH 361F Gangakhed to Loha road Package from Gangakhed 30.400 to Loha 71.400 Upgradation two Lanes with paved should...
Balance works of 6-laning of Kozhikode Bypass
Balance work of Widening of 4 nos existing 2 Lane major Bridge of 6-laning of Kozhikode Bypass (Calicut Bypass) (Vengalam to Ramanattukara Jn.) section of...
Construction of Bridges in Karbi-Anglong District
Construction of Bridges in Karbi-Anglong District: I) Br. No.3/1 on DS Road to BhetaGaon. 2) Br. No. 1/1 on DS Road to Khongching. The bid...
MoRTH Allocates Rs 1,346.81 Crore for NH-716 Expansion Project
The Ministry of Road Transport and Highways (MoRTH) has approved an allocation of Rs 1,346.81 crore for the expansion project of the existing two-lane paved...
Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border to Puttur
H.G. Infra Engineering has emerged as the Lowest Bidder for NHAI's Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border to Puttur...
Construction of Bridges in Hailakandi District
Construction of Bridges in Hailakandi District: I) Br. on over river Dholeshwar connecting villages Chandipur Pt-1 with Chiporsangan Pt-III (Chandipur G.P & Chi...
Construction of Bridges in Baksa District
Construction of Bridges in Baksa District i) Br. No. 2/1 on Quarry Chowk to Dighaldonga Road ii) Br. No. 1/2 on Bali Village Road. The...
Strengthening, Upgradation and Widening of Nandur Shigote Kolhar Section
Strengthening, Upgradation and Widening of Nandur Shigote Kolhar Section of NH-160D km. 00.00 to 47.370 Nandur Shingote Kolar Section, Total Length 47.37 km. 2L...
Construction of Bridges in Hojai District
Construction of Bridges in Hojai District: I) Br. No.1/1 on Murajhar Samarali ii) Br. No.1/1 on Changmaji to Modartoli via Mikirgaon. The bid due date...
Construction of various Major bridges between Naliya to Jakhau
Construction of various Major bridges including misc. works like pitching, toe wall, floor protection and other misc. works required for suc...
Construction of vehicular access road at Calicut Airport
Construction of vehicular access road and other face-lifting works in the premises of Sewage treatment plant at Calicut International Airpor...
Construction of cement concrete road from Dahiwal Nallah to Yekona Village
Agrico Steel Engineering has bagged a contract from Western Coalfields Limited towards the Construction of cement concrete road from Dahiwal...
Bridge over Brahmaputra connecting Bharalumukh to North Guwahati
Construction of Bridge over the river Brahmaputra connecting Bharalumukh (Panbazar) to North Guwahati. The environmental clearance is sought...
