5 Kwp on Grid Rooftop Solar Photo Voltaic Power Plant at Canara Bank Yendapallivalasa Branch
Request for Proposal for supply, installation, testing, commissioning, and maintenance of 5 Kwp on Grid Rooftop Solar Photo Voltaic Power Pl...
NHPC Commences 300 MW Solar Power Plant in Bikaner, Rajasthan
NHPC initiates the establishment of a 300 MW solar power plant in Bikaner, Rajasthan, under the Government of Indias CPSU Scheme, Phase-II,...
Jakson Green Secures 100 MW Solar PV Plant Project in Rajasthan
Jakson Green clinches a power purchase agreement (PPA) with Rajasthan Urja Vikas Nigam Limited (RUVNL) for a 100 MW solar photovoltaic (PV)...
O&M of Ground Mounted/ Floating Solar PV Power Projects of CIL
Request for expression of Interest for Empanelment of EPC-cum-O&M Contractors for development and O&M of Ground Mounted/ Floating Solar PV P...
Provision of 1 MWp Grid connected roof top solar power plant, on Railway Stadiums
Provision of 1 MWp Grid connected roof top solar power plant, on Railway Stadiums, Railway Clubs, institutes, community centres, residential...
Ayana Renewables Aims for 4 GW Solar and Wind Capacity by March 2025
Independent power producer Ayana Renewables outlines plans to achieve approximately 4 GW of operational solar and wind power capacity by March 2025. With the cu...
Grid-connected 800KWp Rooftop Solar PV at Jankipuram
Design, Engineering, Fabrication, Supply, Installation, Testing, and Commissioning of Grid-connected 800KWp Rooftop Solar PV, including oper...
Provision of On grid Solar power plant at 20 stations over Prayagraj
Provision of On grid Solar power plant and off grid Solar power plant at 20 stations over Prayagraj Division. The bid due date is 15-Mar-202...
15 MW solar power project contract from Aether under CPP segment
Bagged a new order from Aether Industries Limited for 15 MW for executing solar power project under Captive Power Producer (CPP) Segment. Th...
5 MW solar power project contract from Skywin under CPP segment
Bagged a new order from Skywin Paper Industries Private Limited for 5 MW for executing solar power project under Captive Power Producer (CPP...
5.60 MW solar power project contract from Shree Varudi Paper under CPP segment
Bagged a new order from Shree Varudi Paper Mill LLP for 5.60 MW for executing solar power project under Captive Power Producer (CPP) Segment...
2 MW solar power project contract from Shree Varudi Paper under CPP segment
Bagged a new order from Sanwariya Processors Private Limited for 2 MW for executing solar power project under Captive Power Producer (CPP) S...
3 MW solar power project contract from Jayco Synthetics under CPP segment
Bagged a new order from Jayco Synthetics for 3 MW for executing solar power project under Captive Power Producer (CPP) Segment. The contract...
2.10 MW solar power project contract from Radhey Krishna Terene under CPP segment
Bagged a new order from Radhey Krishna Terene Private Limited and Jay Metal Tech, for 2.10 MW for executing solar power project under Captiv...
MES Tender for 1.33 MW Solar Power Projects
The Military Engineer Services (MES) has invited bids for 1.33 MW solar power projects at various locations within Jaipur Military Station....
8.8 kWp Rooftop Grid Interactive Solar Power plants in G8 Building
Design, Supply, Installation, Testing and Commissioning of 8.8 kWp Rooftop Grid Interactive Solar Power plants in G8 Building Stilt plus 8 F...
Three-Year Comprehensive O&M for 40 MW Solar Plants in West Bengal
Three years comprehensive operation and maintenance of 4 nos X 10 MW ground mounted solar plant installed at different districts of West Ben...
APGCL Tender for 25 MW Solar Power Project
APGCL has issued a tender to develop a 25 MW ground-mounted solar power project at the Namrup Thermal Power Station in Dibrugarh district. T...
Hartek Power Secures ?113 Crore Order for Solar PV Plant in Bihar
Hartek Power has clinched a substantial order from SJVN Green Energy Limited. The project entails the development, implementation, and maint...
Development of Infrastructure of a solar park in Banaskantha district
Torrent Power has formalized a Memorandum of Understanding (MOU) with the Gujarat Government entailing an investment of Rs 4,500 crores in d...
50 kWp roof top solar plant at Income Tax Office building Rajkot
Supplying, installation, testing and commissioning of 50 kWp roof top solar plant at Income Tax Office building Rajkot. The bid due date is...