Upgradation of Nashik Peth Road NH-848 in Ghat Section
Upgradation of Nashik Peth Road NH No 848 in Ghat Section of Forest Length (Km 38-970 to Km 41-816 and Km 49-730 to Km 51-413)...
Rehabilitation and Concreting of Kalyan-Nirmal Road
Rehabilitation and upgradation by concreting to 2LPS of Kalyan-Nirmal Road from design Km 37-850 to 57-900 of NH-61 in Thane District in the...
Construction of LHS and Approaches over Rewari-Sardulpur Rail Line
Construction of LHS and its approaches in lieu of level crossing No.C-124 over Rewari-Sardulpur Railway line crossing NH-709 (Extn.) in Loha...
Curve Improvement at Bhosate Ghat on NH-66
Rectification of Black spot and Curve improvement of Bhosate Ghat turn on Mumbai Goa NH-66 in Km 180.550 to km 181.950 And other road safety...
2-Lane Paved Shoulder Project on NH-548CC in Maharashtra
Widening to 4 lane with road side drain in Udaynagar village and construction of 2LPS from section 94.600 to 65.100 on Chikhali Khamgaon NH5...
RCC Drain and Paved Shoulder Works in Adyal, Chittaranjanpur
Construction of RCC Drain, Pedestrian Guard Railing, BT Paved shoulder in Adyal, Chittaranjanpur, Yenapur Village from Km. 160.860 to 161.50...
Road Safety Works on Panvel-Panaji NH-66 in Ratnagiri
Road Safety works in Panvel - Panji Road NH 66 (Erstwhile NH-17) in Km. 241/300 (76/880) to 332/200 (165/270). Construction of Foot Bridge,...
RCC Drain and Paved Shoulder in Ashti on NH-353C
Construction of RCC Drain, Pedestrian Guard Railing, BT Paved shoulder in Ashti Town from Km 179.350 to 181.650 (Length 2.300 Km) of NH 353C...
Foot Over Bridge and Bus Facility Construction on NH-66 in Ratnagiri
Construction of a Foot Over Bridge at Package V of NH-66, covering Parshuram Ghat and Kamthe Parshuram Ghat - Arawali section, along with se...
Wastewater Treatment Plant Construction for KRNMS Hospital
UZHR 2024-25 Pro No 183/25 DPR Formation and Construction of Waste Water Treatment Plant for KRNMS Hospital. The bid due date is 25-Nov-2024...
Ahilya Bridge Construction and Bhima River Road Widening Planned
Construction of new high level bridge on upstream side of existing bridge known as Ahilya Bridge across Bhima River Chainage 37.686 L 365.00...
Consultancy for NH-347A Upgradation
Consultancy Services for Prepartion of Detailed Project Report and Feasibillity study for Up-gradation of Four Lane with Paved Shoulder of N...
Wildlife Mitigation Consultancy on NH-247
Consultancy services to prepare a Detailed Project Report (DPR) and feasibility study for the construction of a two-lane road with paved sho...
Authority Engineer Services for Nandur Shingote-Kolhar Section
Authority Engineer Services for consultancy and supervision of the strengthening, upgradation, and widening of the Nandur Shingote - Kolhar...
Hydra Cranes Hiring Contract Announced
Annual Contract for Hiring Hydra Cranes on an and when required Basis. The bid due date is 25-Nov-2024. Tender Id: 2024_dps_832169_1....
Drainage Construction on Washim Dastapur Karanja Road
Construction of Box Drain and CC Drains on Washim Dastapur Karanja road NH 161E at Pusad Naka Dist Washim in the state of Maharashtra under...
Upgradation of Amgaon-Gondia NH-543 to Two-Lane
Balance work of Up-Gradation of Amgaon-Gondia, National Highway 543 in Km 24/985 to 27/025, 32/130 to 34/088 & 39/475 to 41/625 [Design Km 5...
Reconstruction of Major Bridges at Bav and Anjanari on Mumbai-Goa Highway NH-66
Reconstruction of sub-standard weak Major Bridge at Bav Km 117.110 and Major Bridge at Anjanari Km 143.500 on Mumbai Goa Highway NH.66 in Ka...
Warehouse Development Project on NH50 in Karnataka
Development, Operation and Maintenance of Warehouses on different sections of National Highway on lease basis. Site 1: NH50/336+530/RHS/Chit...
Warehouse Development Project Along NH-48 in Rajasthan
Development, Operation and Maintenance of Warehouses on different sections of National Highway on lease basis. The location includes NH-48/D...
Widening and Upgradation of Bhimashankar-Taleghar-Wada-Rajgurunagar Road
E-tenders are invited for the widening, reconstruction, and upgradation to 2PLS configuration for the work of Bhimashankar-Taleghar-Wada-Raj...
Greenfield Connectivity Construction on Pathankot Link Road Initiated
Construction of a four/six-lane greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar Village on the Delhi-Amritsar-Katr...
