Category: PEB

PEB Hangar Construction at ICF

Annual rate contract for painting of runway, taxi track and apron in operational area at Dehradun Airport for 2026-27. The bid due date is 29-Apr-2026....

Construction of PEB Warehouse at Jatni

Deepak Mineral Bikaner has proposed expansion of ball clay, fire clay and red and yellow ochre mining capacity from 20,000 TPA to 5,35,880 TPA (ROM)...

Pre-Engineered Steel Building System

United Drilling Tools Limited has received a domestic order from Oil and Natural Gas Corporation Limited for supply of large OD casing pipe in the...

Pre-Engineered Steel Building System

Interarch Building Solutions has bagged an order for design, engineering, manufacturing, supply, and erection of a pre-engineered steel building syste...