Operations at Moti Naroli Fee Plaza
Highway Infrastructure has received a Letter of Acceptance from National Highways Authority of India for operations at Moti Naroli Fee Plaza in Gujara...
NH-333A Bypass and Realignment Project
The project involves construction of three bypasses at Sheikhpura, Jamui and Khaira, along with one realignment at Sikandra, along NH-333A in Bihar. T...
GohpurNumaligarh Road-cum-Rail Tunnel project
Construction of the GohpurNumaligarh Road-cum-Rail Tunnel project, a twin-tube underwater tunnel beneath the Brahmaputra linking Gohpur in Biswanath...
SC Services for NH-48 Service Roads in Gujarat
Supervision consultancy services for rehabilitation and construction of service roads, RCC drains, and overlay works on SuratValsad and ValsadVapi s...
Provision of Watch Tower and Road Works at AF Station Kalaikunda
Provision of watch tower and addition/alteration to roads at DDK Range at Air Force Station Kalaikunda under GE (P) (AF) Kalaikunda. The bid due date...
Odisha plans survey for six-laning of NH-55
The Odisha government has announced a survey for six-laning of NH-55 between Cuttack and Sambalpur to enhance regional connectivity and support industrial...
Kaziranga Elevated Corridor Project
Construction of the Kaziranga Elevated Corridor Project (NH-715) in Assams Nagaon and Golaghat districts involves development of a 34.45-km elevated...
KimDahegam Expressway Stretch Nears Completion
The KimDahegam stretch of the VadodaraMumbai Expressway has reached about 93 percent completion, according to the National Highways Authority of Ind...
User Fee Collection at Jeerangachh Fee Plaza
Engagement of user fee collection agency at DC Palli Fee Plaza and upkeep/maintenance of adjacent toilet blocks. The bid due date is 27-Mar-2026. Tender ID:...
Huri–Taliha Section of NH-913 from km 0.000 to km 55.725
ACME Greentech Seventh Private Limited, a wholly owned subsidiary of ACME Solar Holdings Limited, has executed two power purchase agreements with SJVN Limited...
FASTag MLFF User Fee Collection at 14 Fee Plazas (Bundle-DL 01)
National Highway Authority Of India has proposed development of the Gorakhpur–Siliguri High Speed Access Controlled Corridor covering the Bihar section from km...
Sarli–Huri Section of NH-913 from km 0.000 to km 78.380
The joint venture of Ceigall India Limited and Sushee Infra & Mining Limited has emerged as L1 for construction of road from km 0.000 to...
User Fee Collection at Navasari Fee Plaza
Selection of acquirer bank for FASTag-ANPR based multi lane free flow user fee collection at 14 fee plazas in Delhi NCR region on fixed transaction...
Huri–Taliha Section of NH-913 from km 55.725 to km 113.250
The joint venture of Ceigall India Limited and Sushee Infra & Mining Limited has emerged as L1 for construction of road from km 0.000 to...
O&M of Lalganj–Hanumana NH-135 Section
Engagement of user fee collection agency at Navasari Fee Plaza and upkeep/maintenance of adjacent toilet blocks. The bid due date is 27-Mar-2026. Tender ID:...
Huri–Taliha Section of NH-913 from km 160.750 to km 209.900
The joint venture of Ceigall India Limited and Sushee Infra & Mining Limited has emerged as L1 for construction of road from km 55.725 to...
Wayside Amenities Development on NH-44
Short-term operation and maintenance of four-lane stretch of Lalganj–Hanumana section of NH-135 under NHDP IVB (Design Package-3). The bid due date is...
User Fee Collection at Chowlaggere Fee Plaza
The joint venture of Ceigall India Limited and Sushee Infra & Mining Limited has emerged as L1 for construction of road from km 160.750 to...
Road Improvement and Beautification at Bhubaneswar
Development, operation and maintenance of wayside amenities on NH-44 (Gwalior–Jhansi road) near Km 112.000 at Dabra on lease basis under DBOT mode. The bid due...
Construction of Vehicular Underpasses at Insuli and Zarap Sawantwadi Junction
Hazoor Multi Projects Limited has been awarded Letter of Award by National Highways Authority of India for user fee collection agency services at Chowlaggere...
GuwahatiNorth Guwahati Bridge project
Construction of the GuwahatiNorth Guwahati Bridge has reached about 95 percent completion, with the main structural works already finished. The proje...
Construction of Skywalk and FOBs on NH-16
Improvement and beautification of Baagchi Cancer Hospital Road from Ch 0/000 to 2/904 km under Bhubaneswar Development Authority. The bid due date is...
