FASTag MLFF User Fee Collection at 13 Fee Plazas (Bundle-RJ 01)
Selection of acquirer bank for FASTag-ANPR based multi lane free flow user fee collection at 9 fee plazas in Rajasthan on fixed transaction fee model....
User Fee Collection at Ramnagar Gansiyari Fee Plaza
Selection of acquirer bank for FASTag-ANPR based multi lane free flow user fee collection at 13 fee plazas in Rajasthan on fixed transaction fee model....
User Fee Collection at Tarwa Deva Fee Plaza
Engagement of user fee collection agency at Ramnagar Gansiyari Fee Plaza on Pratapgarh–Allahabad Bypass Road section of NH-96 (New NH-330). The bid due date is...
User Fee Collection at DC Palli Fee Plaza
Supply and construction of 150 kW solar hybrid/wind power system. The bid due date is 31-Mar-2026. Tender ID:...
User Fee Collection at Tarwa Deva Fee Plaza on NH-91
Engagement of user fee collection agency at Tarwa Deva Fee Plaza on Aligarh–Kanpur section of NH-91. The bid due date is 27-Mar-2026. Tender ID:...
User Fee Collection at Jeerangachh Fee Plaza
Engagement of user fee collection agency at DC Palli Fee Plaza and upkeep/maintenance of adjacent toilet blocks. The bid due date is 27-Mar-2026. Tender ID:...
Huri–Taliha Section of NH-913 from km 0.000 to km 55.725
ACME Greentech Seventh Private Limited, a wholly owned subsidiary of ACME Solar Holdings Limited, has executed two power purchase agreements with SJVN Limited...
FASTag MLFF User Fee Collection at 14 Fee Plazas (Bundle-DL 01)
National Highway Authority Of India has proposed development of the Gorakhpur–Siliguri High Speed Access Controlled Corridor covering the Bihar section from km...
Sarli–Huri Section of NH-913 from km 0.000 to km 78.380
The joint venture of Ceigall India Limited and Sushee Infra & Mining Limited has emerged as L1 for construction of road from km 0.000 to...
User Fee Collection at Navasari Fee Plaza
Selection of acquirer bank for FASTag-ANPR based multi lane free flow user fee collection at 14 fee plazas in Delhi NCR region on fixed transaction...
Huri–Taliha Section of NH-913 from km 55.725 to km 113.250
The joint venture of Ceigall India Limited and Sushee Infra & Mining Limited has emerged as L1 for construction of road from km 0.000 to...
O&M of Lalganj–Hanumana NH-135 Section
Engagement of user fee collection agency at Navasari Fee Plaza and upkeep/maintenance of adjacent toilet blocks. The bid due date is 27-Mar-2026. Tender ID:...
Huri–Taliha Section of NH-913 from km 160.750 to km 209.900
The joint venture of Ceigall India Limited and Sushee Infra & Mining Limited has emerged as L1 for construction of road from km 55.725 to...
NH-727AA Highway Development in BiharUP
Development of Newly declared NH-727AA to 2/4- Lane Standard Highway from Bettiah on NH-727 connecting Patzirwa, Paknaha in the state of Bihar, Piprag...
Trichy Junction RoB Stage-II targeted for June 2026 completion
The work on Stage-II of the Road Over Bridge (RoB) at Trichy Junction is being fast-tracked by the Southern Railway and the Tamil Nadu State...
Bihar Fast-Tracks LakhisaraiPatna Bypass
The Road Construction Department, Bihar, has accelerated work on the greenfield bypass road between Lakhisarai and Patna districts. The 10-km project...
West Bengal lays foundation stone for Gangasagar Setu
The West Bengal government has laid the foundation stone for the four-lane Gangasagar Setu over the Muriganga river to connect Sagar Island with the m...
Zojila Tunnel Construction Progress Update
Megha Engineering and Infrastructures is executing the 13.15 km Zojila Tunnel project for NHIDCL between Ganderbal in Jammu and Kashmir and Drass in L...
Special Repair of Roads at Jabalpur Military Areas
Special repair to roads of Yogendra Singh Enclave and Abdul Hamid Enclave of GRC, and special repair to roads in AOR of 1 MTR under...
CC Road, Drain and Lighting Works in Ayodhya
Construction of CC road, drain, and lighting system from Rampath Marg to Chaurasi Kosi Parikrama Marg via Sadbhavna Hospital in Mohalla Pathan Tolia,...
Six-Laning and Service Road Works on NH-44 in Punjab
Six-laning works including reconstruction of service roads and junctions with rigid pavement and installation of paver blocks on the PanipatJalandhar...
Construction of VUP/Flyover on AyodhyaGorakhpur Section
NHAI plans to construct a VUP/flyover on the AyodhyaGorakhpur section of NH-28 between KM 142.800 a...
