EOI for Supply of Fire Fighting Suits as per NFPA Standards
Expression of interest is invited for the supply of 32 nos. of Fire Fighting suits (As per NFPA Standards). Th...
Electrical Infrastructure Shifting for Soro-Manipur Road Widening, Balasore
Shifting and Construction of 33KV lines, 11KV lines, LT line and sub-station for widening of Soro-Manipur Road...
500 KVA DG Set Installation for MRI Unit at SCBMCH, Cuttack
Supply, Installation, Testing and Commissioning of 500 KVA DG Set with AMF Panel for 3T MRI Machine in Radiolo...
Carbon Credit Consultancy for PMGSY FDR Technology
Consultancy services on the acquisition and trading of carbon credits generated from PMGSY FDR technology and...
Construction of Boundary Wall Behind Community Health Center Sahiya, Kalsi
Construction work of boundary wall and wall behind community health center Sahiya of block Kalsi. The bid due...
Satvik Enterprises plans ferro alloy plant expansion in Paschim Bardhaman
Satvik Enterprises Limited is expanding its existing ferro alloy plant at Panagarh Industrial Park, Paschim Ba...
Masonry stone mining project at Plot no. 21, Pachlangi village
Proposed Masonry Stone Mining Project, Plot. No. 21, Area-1.50 Ha. (Govt. Land), Khasra No- 1482, Near Village...
Century Silicon City plans mixed development in Bangalore Urban
Century Silicon City is seeking environmental clearance for a mixed development project at Sy. No. 42(Part), 4...
Environmental Clearance Sought for EFG Valia Lignite Block in Bharuch
GMDC is seeking environmental clearance for the EFG Valia Lignite Block, an opencast lignite mining project wi...
Arbuda Agrochemicals plans pesticide unit expansion in Sabarkantha
Arbuda Agrochemicals proposes to expand its pesticide manufacturing unit at Plot No. 279-283, GIDC Industrial...
Brahmaputra Riverfront Development in Guwahati to be completed by April
The Brahmaputra Riverfront Development Project in Guwahati, undertaken by Guwahati Smart City Limited, is prog...
Steel plant expansion planned in Saraikela-Kharsawan, Jharkhand
Expansion in existing Steel Plant at vill- Maslewa, Kolabira, Saraikela-Kharsawan (JHK). Proposal of expansion...
Masonry stone mining project at Plot no. 20, Pachlangi village
Environmental clearance is sought for a proposed masonry stone mining project, Plot. No. 20, Area-1.50 Ha. (Go...
Expansion of Residential Project in Sarjapura Hobli, Bangalore
An application for environmental clearance has been submitted for the expansion and modification of a resident...
Hyderabad Metro expansion progressing with DPRs for key routes
Hyderabad Metro Rail Limited is advancing its metro rail network expansion plans, with DPRs for the Medchal, S...
Kedar Phyto seeks clearance for synthetic organic chemicals plant in Kheda
Kedar Phyto is seeking environmental clearance to establish a synthetic organic chemicals manufacturing unit w...
Upgradation of Road to Sigar Military Station, East Siang
Upgradation of road from Mebo ADC HQ. to Sigar Military Station in East Siang (CMCSRDP-II). The bid due date i...
Development of Integrated Public Health Laboratory in Jalandhar
Construction of integrated Public Health Laboratory at 3rd Floor of Civil Hospital (Main Block), District: Jal...
Fire Safety System Upgrade at B M Airport Ranchi Terminal
Reconfiguration of existing terminal building B M Airport Ranchi. SH: Fire Alarm and Fire Fighting system. The...
HPCL to invest ?50,000 crore in renewable energy expansion
HPCL plans to invest up to Rs.50,000 crore to expand its renewable energy portfolio to 10 GW by 2030 through i...
IHCL to develop Ginger hotel in Calicut, Kerala
IHCL has signed a greenfield project for a 100-key Ginger hotel in Calicut City Center, Kerala. Strategically...
Masonry stone mining project at Plot no. 22, Pachlangi village
Environmental clearance is sought for a proposed masonry stone mining project at Plot No. 22, covering 1.20 he...
