Tata Power Allocates ?5,666 Crore for Maharashtra Pumped Storage Plant
Tata Power's board has approved an investment of ?5,666 crore to develop a 1-GW pumped storage plant in Bhivpu...
Syamaprasad Mookerjee Port seeks consultancy for PMU strengthening
Consultancy Service for strengthening of existing Project Monitoring Unit (PMU) of Syamaprasad Mookerjee Port,...
MPRDC invites bids for PMC services for international stadium project
MPRDC invites bids for Project Management Consultancy services for the construction of an international-level...
Hydrographic and topographic survey sub-consultant appointment underway
Appointment of Sub Consultant for Carrying out Hydrographic (Bathymetry and Geophysical Survey) and Topographi...
CCTV installation work initiated at Haldia Sub-Divisional Court
SITC of CCTV installation work at Haldia Sub-Divisional Court In the district of Purba Medinipur, Project ID-...
Terminal reconfiguration planned at Surat International Airport
Reconfiguration of the existing terminal building at Surat International Airport, specifically for the provisi...
Automated Parking System SITC planned for new site
Supply, install, test, commission (SITC), and operate an Automated Vehicle Parking Management System, along wi...
Flagstone Quarry Project at Achholi Seeks Clearance
Environmental clearance is sought for a flagstone quarry project by Anupam Agarwal at Achholi village, Mahasam...
Environmental Clearance Sought for Stone Crusher Plant in Dehradun
Environmental clearance is being sought for the proposed 200 TPH stone crusher plant at Khasra No. 126, 133, 1...
200 TPH Stone Crusher Plant Proposed at Dhakrani, Dehradun
Environmental clearance is sought by M/s Adiyogi Stone Infratech LLP for a 200 TPH stone crusher plant with a...
Pearl Drinks to Produce 12,000 MT Preforms in Samba
Pearl Drinks Limited plans to establish a manufacturing unit in Samba, Jammu and Kashmir, to produce preforms...
NTPC Approves ?80,000 Crore for Thermal Power Projects
NTPC's board has approved investment proposals totaling ?80,000 crore for thermal power projects with a combin...
SPEL to Boost Transformer Production by 2025 with New Facility
Supreme Power Equipment Ltd (SPEL) is constructing a new manufacturing facility, currently 30% complete, to ex...
Upgradation of fire alarm systems at Chennai Airport planned
Upgradation of Fire Alarm System at T1, T4 and Utility Building at Chennai Airport. The bid due date is 08-Jan...
Labour service contract for elevator maintenance at various sites initiated
Annual Service Contract (Labour) for Preventive Maintenance of Elevators (Lifts) installed at various location...
Preventive maintenance service contract for elevators at multiple locations
Comprehensive Annual Service Contract for Preventive Maintenance of Elevators (Lifts) installed at various loc...
Comprehensive maintenance contract for OTIS lifts at Dak Bhawan, New Delhi
Comprehensive maintenance of 8 passenger Lifts of OTIS make at Dak Bhawan, New Delhi. The bid due date is 09-J...
NIFTEM-K invites EOI for campus infrastructure works
NIFTEM-K invites Expressions of Interest (EOI) from Central Agencies and Public Sector Undertakings for the ap...
Architectural consultancy required for construction of academic complex
Providing Architectural and Engineering Consultancy Services from Concept to Commissioning for Construction of...
Consultancy sought for Burn Unit construction with future expansion
Consultancy services are sought for the construction of a 2-storied Burn Unit with a provision for a 3-storied...
20 MLD Sewage Treatment Plant Nears Completion in Kukatpally
The 20 MLD capacity sewage treatment plant (STP) at Khajakunta, Mythrinagar, Kukatpally, is nearing completion...
BBMP to Complete Hebbal-Silk Board Tunnel in 3 Years
BBMP aims to finish the 18-km tunnel road project between Hebbal and Silk Board in three years. The tender for...