PBMC Estimate for Rehabilitation, Nandgaon-Morshi-Warud, NH353 K
Performance based Maintenance Contracts (PBMC) Estimate of Rehabilitation and up gradation of Nandgaon peth Morshi Warud MH MP border section of Nh353 K (Design...
BMRCL Awards Feasibility Study Contracts for Metro Expansion and Double-Decker Flyovers
BMRCL has awarded contracts for feasibility studies to extend its network to the outskirts and for constructing double-decker flyovers under Phase 3. Hyderabad-...
Secunderabad Railway Station upgradation project
South Central Railway (SCR) is progressing with the Rs 700 crore modernization project for Secunderabad Railway Station, with 27% of the work completed. The red...
Renovation Work at Rajouri Garden and Uttam Nagar East Metro Stations
Renovation work of line-3 and 4 stations i.e. Rajouri garden and Uttam Nagar East Metro Stations. The bid due date is 29-Jul-2024. Tender ID: 2024_DMRC_814050_1...
Mechanical Maintenance of Water and Sewage Systems
Mechanical Maintenance of Water Supply, Water treatment and Sewage Treatment systems. The bid due date is 01-Aug-2024. Tender ID: 2024_GSO_816092_1....
Operation of Urea Bagging Plant at NFL Vijaipur
Assistance in operation of conveyor belts, machines in urea bagging plant and other miscellaneous jobs excluding all three loading floor platforms for the year...
Feasibility Study for Bikaner Bypass Ring Road
Consultancy services for feasibility study and preparation of DPR for Bikaner bypass to complete the ring road in Rajasthan. The bid due date is 11-Sep-2024....
Mangalagiri Cricket Stadium to Host Matches Next Year
The International Cricket Stadium in Mangalagiri, Guntur district in the state of Andhra Pradesh, is expected to be ready to host matches by next year....
Bengaluru Satellite Township Ring Road (STRR) Set for December 2024 Completion
The Bengaluru Satellite Township Ring Road (STRR), whose foundation stone was laid in June 2022, is anticipated to be completed by December 2024. This ring...
DPR for Hyderabad-Bengaluru High-Speed Corridor
Consultancy Services for Preparation of DPR for development of Hyderabad-Bengaluru high speed corridor under Master Plan of National Highways with vision 2047 i...
Diamond Power Secures LOI from Adani Energy
Diamond Power Infrastructure Ltd has received a significant letter of intent (LOI) from Adani Energy Solutions Limited (AESL). The contract involves supplying A...
GIAL to Invest Rs. 6,100 Crore in Airport Upgrades
GIAL, a subsidiary of Adani Airport Holdings Limited, plans to invest approximately ?6,100 crore in phased upgrades at Lokpriya Gopinath Bordoloi International...
Balrampur Chini Expands Sugar and Power Capacity at Rudrapur Gularia
Balrampur Chini Mills Ltd. (Unit: Gularia, Division: Sugar) plans to expand its existing sugar unit capacity from 10,000 TCD to 12,000 TCD and increase the...
Godrej Properties Seeks Clearance for Residential and Retail Project
Godrej Properties Limited seeks environmental clearance for a residential development with retail shops at S. Nos. 39, 40/A, 40/B, 41/A, 41/B, 41/C in Village D...
Dabur India Signs MoU with Tamil Nadu Govt to Establish Manufacturing Facility
Dabur India has signed a facilitation Memorandum of Understanding (MoU) with the Government of Tamil Nadu to set up a new consumer goods manufacturing facility...
New Synthetic Resin Manufacturing Unit
Setting up manufacturing unit of Synthetic Resin viz. Urea-Formaldehyde (U-F) Resin and Phenol-Formaldehyde (P-F) Resin with total production capacity of 6000 T...
Dev Shree Granite Plans Granite Mining Project in Rajsamand
Dev Shree Granite proposes a granite mining project (M.L. No-07/2023) over an area of 2.0978 hectares at Khasra Nos. 39, 40, 41, 42, 44, and...
500 cum Overhead Reservoir for Gobardanga Ward 11
Geo-technical investigation, foundation design, and construction of a 500 cum RCC elevated overhead reservoir (Intze type) with a 20-meter staging height and pi...
DPR for NH-23 Upgradation in Jharkhand
Consultancy Services for DPR Preparation for realignment upgradation to 2-lane with paved shoulder/four lanning of NH-23 (New NH-143) from Km 88.00 to Km 211.20...
AMC for 5 Years of 15 Pax. Lift at Incubation Centre (O-Hub) in Infocity SEZ
Comprehensive AMC for 5 Years of 15 Pax. Lift (No.9 and 10 at Block-A) of Schindler make at Incubation Centre (O-Hub) in Infocity SEZ. The...
Installation of Solar Palm Flower Trees in MDDA Areas, Dehradun
SITC of 7 Solar Palm Flower Trees, 5 kW, 6 meters long, under MDDA areas, Dehradun. The bid due date is 23-Aug-2024. Tender ID: 2024_MDDA_73968_1....
Western Railway’s Borivali-Virar Expansion Project Set for 2027
The Borivali-Virar Expansion Project on the Western Railway corridor is progressing, with estimates, designs, and drone surveys completed and alignment finalize...
