Amara Raja to Build Gigafactory in Telangana
Amara Raja Energy & Mobility is developing a Gigacorridor in Divitipalli, Mahbubnagar district, Telangana, for...
Environmental Clearance Sought for Manufacturing Plant in Erode District
Environmental clearance is being sought for a manufacturing plant on 8,100 sq.m (2 acres) at S16 & S17 SIPCOT...
Raghu Vamsi Group Starts ?300 Crore Manufacturing Facility at Shamshabad
Raghu Vamsi Group has laid the foundation stone for a manufacturing facility at Shamshabad Aerospace Park. Th...
Kota Greenfield Airport Approved, Operations by 2027
The Environment Ministry has granted clearance for the construction of Kotas Greenfield Airport, setting the...
Relocation of Elevators at NIT Rourkela
Relocation of two nos. elevators at Electrical and Electronics Sc. Building from basement floor to ground floo...
Consultancy Services for CCTV Project in Gurugram
Consultant required for providing technical consultancy services for the Phase 3 CCTV project to ensure comple...
DPR Preparation for National Highways Capacity Augmentation in Tamil Nadu
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various sel...
Microcosm Reframin to Make Refractory Materials in Odisha
Microcosm Reframin Private Limited plans to establish a manufacturing facility for refractory raw materials, i...
Road Strengthening in Silachari Block
Rebidding for strengthening and improvement of roads under the World Bank-aided TRESP in Silachari Block, Amar...
Environmental Clearance for BPL Kharkhoda Factory in Sonipat
Bellsonica Private Limited (BPL) has applied for environmental clearance for its proposed BPL Kharkhoda New Fa...
General Consultant for Thane Ring Metro Project
Engagement of a general consultant for the Thane Integral Ring Metro Project under Maha-Metro. Bid due date: 1...
Silicon City Phase-IV Group Housing Development in Noida
Development of Silicon City Phase -IV Group Housing including allied works at Plot No. GH 01 A, Sector-76, Noi...
Dream Valley Phase-III Group Housing Development in Greater Noida
Development of Dream Valley Phase -III Group Housing including allied works at Plot No. GH 09 Tech Zone -IV, G...
Consultancy for Traffic Simulation and City Logistics Plan for Mumbai
Consultancy Services for Traffic Simulation Model, Road Safety Audit and City Logistic Plan for Mumbai City of...
Firefighting System Maintenance for NGN Corridor
Maintenance contract of firefighting system installed at NGN Depot, Staff quarter and 21 Nos. stations of NGN...
Repair and Renovation of Infrastructure at NSC, AO, Guntur
Repair and renovation of godown, office building, and other infrastructure at NSC, AO, Guntur. The bid due dat...
Consultancy for Effluent Treatment Plant at TPT Campus, Chandigarh
Providing consultancy services for construction of 25 KLD Effluent Treatment Plant for Composite Hospital at T...
Operation and Maintenance of Water Supply System for 1 Year
Operation and maintenance work for 01 years for water supply system including all chemicals (alum, chlorine, l...
JSW Energy to Build Wind Turbine Blade Plant in Karnataka
JSW Energy plans to invest $50 million in a wind turbine blade manufacturing facility at its 12.5 MTPA steel p...
Overhauling of Boiler and Pressure Parts at BTPS Unit 2
Overhauling of the boiler and its pressure parts, HP valves, boiler casing, and insulation repair for Unit 2 a...
Provision of Sewage Treatment Plant (STP) at AF Station Kumbhirgram
Provision of Sewage Treatment Plant (STP) at AF Station Kumbhirgram. The bid due date is 19-Dec-2024. Tender I...
Concrete Lining of Karhali Disty from RD 32480-44720 with Regulator Reconstruction
Estimate for concrete lining of Karhali Disty from RD 32480-44720 including reconstruction of Head Regulator c...