Construction of Grade-Separated Structure VUP on Ajmer-Nagaur Section
Construction of a grade-separated structure (VUP) on the Ajmer-Nagaur section of NH 89 (New NH-58) at three locations: KM 3/630 (Kayad), KM...
Commercial-Residential Redevelopment Proposed in Ahmedabad
Environmental clearance is sought for the project of Commercial + Residential Building (Redevelopment of Public Housing Policy - 2016) on Im...
Shiv Shaligram Celestial Project Launched in Ahmedabad
Environmental clearance is sought for proposed project Shiv Shaligram Celestial at F.P.No.: 92/2, O.P.No.: 92/2, T.P.S. No.: 45 (Chandlodiya...
Upgradation of BSNL Office to Railway Crossing in Bhandara City
Upgradation of BSNL Office to Railway Crossing in Bhandara City from Chainage Km 168/180 to Km 168/920 (Length 0.740 Km) of NH-247 to Two La...
Consultancy for NH-361F Rehabilitation and Upgradation
Consultancy services for Authority Engineer (AE) for the rehabilitation and upgradation of the Gangakhed-Palam-Loha road (NH361F) to a 2-4 l...
PMC Services for Rail Over Bridge at Jawaharlal Nehru Port
Project Management Consultancy Services for Construction of Rail Over Bridge (ROB) near Coastal Berth at Jawaharlal Nehru Port. The bid due...
Construction of 7.0 MLD Water Treatment Plant at Ferozepur
Construction of 7.0 MLD Water Treatment Plant and other related works including Operation and Maintenance for a period of 5 years at Ferozep...
Warehouse/Storage Facility Planned in Phaltan
Environmental clearance is sought for the proposed Warehouse/Storage Project at Gat No.215, 216/1, Kalaj, Tal.- Phaltan, District: Satara....
Design Consultancy for Structures on Bangalore Metro Corridor-2
DDC 3-Detailed Design Consultancy Services for all Structures-Elevated Viaduct, Double Decker, Single Decker/Double Decker Stations, Depots...
Foot Over Bridge and Bus Facility Construction on NH-66 in Ratnagiri
Construction of a Foot Over Bridge at Package V of NH-66, covering Parshuram Ghat and Kamthe Parshuram Ghat - Arawali section, along with se...
RCC Drain and Paved Shoulder Works in Adyal, Chittaranjanpur
Construction of RCC Drain, Pedestrian Guard Railing, BT Paved shoulder in Adyal, Chittaranjanpur, Yenapur Village from Km. 160.860 to 161.50...
Ahilya Bridge Construction and Bhima River Road Widening Planned
Construction of new high level bridge on upstream side of existing bridge known as Ahilya Bridge across Bhima River Chainage 37.686 L 365.00...
RCC Drain and Paved Shoulder in Ashti on NH-353C
Construction of RCC Drain, Pedestrian Guard Railing, BT Paved shoulder in Ashti Town from Km 179.350 to 181.650 (Length 2.300 Km) of NH 353C...
Aim Moulding Spares Plans New Production Unit in West Bengal
Aim Moulding Spares plans to manufacture lighting and signaling products, including aviation obstruction lamps and traffic signal lights, wi...
JSW Group Aims for 50 GWh Battery Manufacturing Facility by 2030
JSW Group is set to establish a battery manufacturing facility with a capacity of 50 GWh by 2028-2030, following its recent acquisition of a...
Drainage Construction on Washim Dastapur Karanja Road
Construction of Box Drain and CC Drains on Washim Dastapur Karanja road NH 161E at Pusad Naka Dist Washim in the state of Maharashtra under...
Swapna Developers Proposes Residential-Commercial Complex in Margao, Goa
Swapna Developers has proposed the construction of a residential cum commercial complex on property bearing Chalta No. 21, 25, 41, and 51 of...
Construction of LHS and Approaches over Rewari-Sardulpur Rail Line
Construction of LHS and its approaches in lieu of level crossing No.C-124 over Rewari-Sardulpur Railway line crossing NH-709 (Extn.) in Loha...
Upgradation of Amgaon-Gondia NH-543 to Two-Lane
Balance work of Up-Gradation of Amgaon-Gondia, National Highway 543 in Km 24/985 to 27/025, 32/130 to 34/088 & 39/475 to 41/625 [Design Km 5...
Commercial Project with 108 Units in Vastrapur Seeks Environmental Clearance
The environmental clearance is sought for a proposed commercial project at Survey No. 198/1, F.P. No. 102 of [O.P. No.: 102, Draft TPS No. 3...
JSW Green Mobility to Invest ?27,200 Crore in New Electric Vehicle Plant
JSW Green Mobility has been allocated 636 acres of land in the Bidkin node of AURIC city for an electric vehicle manufacturing plant, set to...
Consultancy for NH-347A Upgradation
Consultancy Services for Prepartion of Detailed Project Report and Feasibillity study for Up-gradation of Four Lane with Paved Shoulder of N...
