DPR Preparation for Widening and Strengthening on NH-20
Consultancy services are required for the preparation of a Detailed Project Report (DPR) for the widening and strengthening of the road to 4...
Electric Steam Boiler Replacement at Nangal Workshop Announced
Replacement of 1 No. Existing Steam Boiler With New Electric Steam Boiler at Nangal Workshop. The bid due date is 13-Nov-2024. Tender ID:...
Technical Agency for Quality Assurance in KDS Port Road Upgradation
Tender For Selection of a Technical Agency for Providing Third Party Inspection / Quality Assurance Services for the Project Revamping/ upgr...
RCC Structure Design and Build at Alandur RSS
Design and Construction of RCC framed structure covering open transformer area at Alandur RSS including civil, MEP and misc. Works. The bid...
Pneumatic Conveying System for BPCL Polypropylene Project in Kochi
Pneumatic Conveying System Package (Conveyor Pneumatic System) for Polypropylene Project-kochi Refinery of M/s Bharat Petroleum Corporation...
Additional Office Room for IT Department at Gangotri Bhawan
Construction of Additional Office Room for I.T Department Gangotri Bhawan, Rishikesh. The bid due date is 13-Nov-2024. Tender ID: 2024_THDC_...
Technical Audit of EOT Cranes Underway
Technical Audit/Health Check-up of 8 Nos. of EOT Cranes. The bid due date is 19-Nov-2024. Tender ID: 2024_BARC_831197_1....
Consultant Engagement for Grade-A Warehouse Design in Chennai
Engagement of consultant for detailed engineering/design for Construction of grade-A warehouse of 13,000 sqm (approx) having ambient and chi...
HVAC Installation for OPD Extension at Dr. B Borooah Cancer Institute
Supply, installation, testing, and commissioning of HVAC systems for the vertical extension of the OPD building's third floor at Dr. B Boroo...
CMAC for Air Conditioning and Water Equipment Announced
Comprehensive Maintenance Annual Contract (CMAC) for air conditioners, water coolers, and water dispensers at the ITER-India office and lab....
Powerpack Room and MME Building Modifications at IIT Kharagpur
Construction of a new Powerpack room and PM lab extension and modification of main entrance of MME Building. The bid due date is 13-Nov-2024...
Supply and Installation of DG Sets at OFC Masonry Huts
Supply and installation of 15 KVA DG Sets at OFC Masonry Huts (6 Nos) situated at Tenali, Narasaraopet, Venukonda, Markapur Road, Giddalur a...
Electrical Work Planned for Office Near NITB at S.V. Airport, Raipur
Construction of office space adjacent to NITB at S.V. Airport, Raipur. SH: Electrical Work. The completion is targeted in 6 months. The bid...
Vinayak Education Society Proposes Educational Building in Greater Noida
Vinayak Education Society is proposing the construction of an educational and hostel building at Plot No-6B, Knowledge Park-II, Greater Noid...
Feasibility Study for Micro Hydro Power Plant Development
Consultancy Services for conducting feasibility study for development of Micro Hydro Power Plants on Build, Own, Operate and Transfer (BOOT)...
Tata Motors to Invest ?9,000 Crore in New Tamil Nadu Plant
Tata Motors plans to establish a new manufacturing plant in Tamil Nadu, aiming to produce up to 2.5 lakh vehicles annually at full capacity....
BMC to Modernize 47 Municipal Markets in Mumbai
The Brihanmumbai Municipal Corporation (BMC) plans to renovate 47 municipal markets in Mumbai, with 14 under direct management and 20, inclu...
NMDC to Replace Elevators at Corporate Office in Hyderabad
Replacement of 04 Nos. of Elevators at NMDC Corporate Office, Hyderabad. The bid due date is 13-Nov-2024. Tender ID: 2024_NMDC_776135_1....
30-Bed Integrated Ayush Hospital to Be Built in Kottarakkara, Kollam
Setting up of 30 Bedded Integrated Ayush Hospital at Kottarakkara in Kollam District. The bid due date is 13-Nov-2024. Tender ID: 2024_WPCOS...
Bharat Innovative Glass Plans Industrial Facilities in Kancheepuram
Bharat Innovative Glass Technologies proposes the construction of industrial buildings for the finishing process of cover glass for mobile p...
DPR Preparation for Bridges on NH-730 in Uttar Pradesh
Consultancy Services for Preparation of Detailed Project Report for construction of 02 Lane Bridges at Km 92.911 Km 99.206 Km 100.600 Km 121...
Heavy-Duty Material Handling Setup at Daund Electric Loco Shed
SITC of Heavy Duty Stacking at Store Ward and Material Handling Equipment, etc. in Connection with setting up of New Electric Loco shed at D...