Construction of Bridges in Karbi-Anglong District
Construction of Bridges in Karbi-Anglong District: I) Br. No.3/1 on DS Road to BhetaGaon. 2) Br. No. 1/1 on DS Road to Khongching. The bid...
Replacement of DG Set of Mini Sectt Phase- I
Replacement of DG Set of Mini Sectt Phase- I in Distt Fatehabad. The bid due date is 27-Mar-2024. Tender ID: 2024_HRY_368585_1....
MoRTH Allocates Rs 1,346.81 Crore for NH-716 Expansion Project
The Ministry of Road Transport and Highways (MoRTH) has approved an allocation of Rs 1,346.81 crore for the expansion project of the existing two-lane paved...
Baybliss project is coming up at Mumbai
The environmental clearance is sought for the proposed Building project known as Baybliss, located at Plot bearing C.S. No. 1569 and 4/1564 of Girgaum Division,...
Routine / Prive / Breakdown and Annual maintenance works of Turbines at Jawahar Sagar
Annual contract for Routine / Prive / Breakdown and Annual maintenance works of Turbines and associated equipments/ auxiliaries and Gantry/EOT Cranes of 3x33 MW...
Expansion of resin manufacturing at Morbi
Auralam Laminates LLP is seeking environmental clearance for expansion project to manufacture different types of Resin (1000 MT/M), located at Survey No. 163p5...
AMRC for various capacity DG sets at various dewatering stations
Annual Maintenance Rate Contract for minor repairs/replacement to various capacity DG sets at various dewatering stations located in and around Srinagar city. T...
Construction of 1000 Mt Warehouse at Ahmednagar
Construction of 1000 Mt Warehouse at Ahmednagar. The completion is targeted in 12 months. The bid due date is 03-Apr-2024. Tender ID: 2024_DOAWB_1014434_1....
Expansion of Common Bio-medical Waste Treatment Facility at Bagalkote
Expansion of Common Bio-medical Waste Treatment Facility from 50 kg/hr to 200 kg/hr by installing an additional 150 kg/hr incinerator and other allied facilitie...
Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border to Puttur
H.G. Infra Engineering has emerged as the Lowest Bidder for NHAI's Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border to Puttur...
Redevelopment of Adarsh Nagar at Faridabad
Redevelopment of Adarsh Nagar, Faridabad with Defect liability period of two years and including maintenance for 5 years under Smart City Mission. The bid due...
Integral Bulk Drug Biopharmaceutical facility at Bommasandra
The environmental clearance is sought for the proposed Integral Bulk Drug Biopharmaceutical facility and formulation facility for manufacturing drug substances...
Development of 2 nos collateral roads Shani mandir and Sector-28 Main road
Development of 2 nos collateral roads Shani mandir and Sector-28 Main road under smart city project Faridabad, Haryana. The bid due date is 28-Mar-2024. Tender...
ProjectX India – 1st April 2024 (Downloadable PDF edition)
ProjectX India | 1st April 2024 edition provides you with power-packed information on 269 projects, contracts and tenders from 65 sectors and sub-sectors of the...
Upper Burhner Project Dam in Madhya Pradesh
Construction of Upper Burhner Project Dam and Pressurised pipe irrigation network from Madhya Pradesh Water resources department, Govt. of Madhya Pradesh....
Foundation Stone Laid for Barethi Solar Power Project in Madhya Pradesh
NTPC REL is setting up 630 MW Barethi Solar Power Project at the Barethi Renewable Energy Park in Chhatarpur District. The foundation stone was recently...
Construction of Shed 197.43 Sq. Mtr at Jalna
Construction of Shed 197.43 Sq. Mtr. and Warehouse 2000 MT at Jalna District. The completion is targeted in 12 months. The bid due date is...
Sewage Treatment Plant at 8 Nos. Water Metro Terminals
Design, manufacturing, supply, installation, testing and commissioning of SBR Type Sewage Treatment Plant at 8 Nos. Water Metro Terminals (8 KLD - 1 No., ...
Construction of Warehouse-510 Mt for Sitamai Farmer Producer
Construction of Warehouse-510 Mt for Sitamai Farmer Producer Company Ltd. Shirte at Gat No.220. The completion is targeted in 6 months. The bid due date...
Pre-Engineered warehouse building at Parbhani
Dismantling old warehouse and construction of new 1/1800 MT Pre-Engineered warehouse building with ancillary works at warehouse complex Sailu, Dist. Parbhani. T...
Development of Ropeway between Ujjain Jn and Mahakaleshwar
Independent Engineer Services for Supervision of Development of Ropeway between Ujjain Jn Railway Station and Mahakaleshwar Temple in the State of Madhya Prades...
Expansion of solar cell manufacturing unit at Gangaikondan village
The environmental clearance is sought for the expansion of solar cell manufacturing unit with additional buildings by M/s. TP Solar Limited (Unit -2 ), at...
