Supply, Installation, and Demonstration of Online UPS (15 KVA)
Supply, installation, and demonstration of online UPS (15 KVA) as per annexed specifications (Annexure-1). Qty...
AMRUT 2.0 – Upgradation of UWSS to Punalur Municipality
Renovation of the existing Urban Water Supply Scheme (UWSS) for Punalur Municipality, including replacement of...
Jal Jeevan Mission Kulakkada – Phase II
Jal Jeevan Mission Kulakkada - Phase II - Design, construction, commissioning and maintenance for a period of...
Vrindavan Industries Plans Speciality Chemicals Manufacturing Unit at Sarigam
Vrindavan Industries has proposed a project for the manufacturing of speciality chemicals, pharma intermediate...
SPL Repair of Water Treatment Plant at Water Gate
Providing specialized repair services for the Water Treatment Plant at Water Gate, including replacement of ag...
District Centre Upgradation Planned at Bhikaji Cama Place
Environmental clearance is sought for the Upgradation and Renovation of District Centre at Bhikaji Cama Place,...
Captive Power Plant Expansion in Sambalpur, Odisha
Environmental clearance is sought for expanding the captive power plant capacity from 900 MW to 1,230 MW, incl...
Captive Power Plant Expansion in Sambalpur, Odisha
Environmental clearance is sought for expanding the captive power plant capacity from 900 MW to 1,230 MW, incl...
Intellion Park Development in Navi Mumbai
Environmental clearance is being sought for the expansion in EC for Intellion Park project located at Plot No....
Airport Civil Maintenance at Dibrugarh Airport
Miscellaneous Civil work on Operational area and Terminal building at Dibrugarh Airport (From 2025 to 2026). T...
Localizer and Glide Path at Kolhapur Airport
Construction of Localizer (LLZ) and Glide Path (GP) at Kolhapur Airport. The bid due date is 04-Jul-2025. Tend...
LHS Cable and Fire Alarm Integration for CHP Conveyor Belt Area
Supply, installation, and commissioning of LHS cable along with accessories and integration with the existing...
Structural Design and Drawing Services for Trainee Sailor Accommodation at INS Satavahana
Consultancy services for structural design and drawings for the provision of deficient single living accommoda...
Traction System Upgrade Planned on Itarsi–Amla Rail Section
Rail Vikas Nigam has secured a contract from Central Railway in May 2025, to upgrade the electric traction sys...
RITES sole bidder for Gurugram Metro DPR preparation
Haryana Mass Rapid Transport Corporation (HMRTC) has received a single bid from RITES for preparing detailed p...
Empanelment of Firm/Consultancy for IEC and BC Activities for SS2025
Empanelment of firm/consultancy for IEC (Information, Education, Communication) and BC (Business Correspondent...
Indian Railways Awards Supply Order to Power Equipment Firm
Power and railway equipment producer, has announced that it has received a supply order from Indian Railways....
Nagpur Metro Phase 2 to add Kanhan Extension
Nagpur Metro Phase 2 is set for a 1.3-km extension of the Kamptee corridor from Automotive Square to Kanhan vi...
Consultancy Services for Structural Design and Infrastructure at INS Chilka
Consultancy services for structural design, drawings, including estimates for the provision of deficient singl...
B R Goyal Infra Wins NHAI Toll Collection Contract on NH-47
B R Goyal Infrastructure has secured a work order from the National Highways Authority of India (NHAI) for tol...
Lucknow Metro Phase 1B East-West Corridor cleared by PIB
Lucknow Metro’s Phase 1B East-West Corridor, spanning 11.165 km from Charbagh to Vasant Kunj, received clearan...
Consultancy Services for Architectural Drawings at INS Chilka
Provision of architectural drawings for deficient single living accommodation and training infrastructure for...
