AMRC for various capacity DG sets at various dewatering stations
Annual Maintenance Rate Contract for minor repairs/replacement to various capacity DG sets at various dewatering stations located in and around Srinagar city. T...
Construction of 1000 Mt Warehouse at Ahmednagar
Construction of 1000 Mt Warehouse at Ahmednagar. The completion is targeted in 12 months. The bid due date is 03-Apr-2024. Tender ID: 2024_DOAWB_1014434_1....
Expansion of Common Bio-medical Waste Treatment Facility at Bagalkote
Expansion of Common Bio-medical Waste Treatment Facility from 50 kg/hr to 200 kg/hr by installing an additional 150 kg/hr incinerator and other allied facilitie...
Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border to Puttur
H.G. Infra Engineering has emerged as the Lowest Bidder for NHAI's Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border to Puttur...
Redevelopment of Adarsh Nagar at Faridabad
Redevelopment of Adarsh Nagar, Faridabad with Defect liability period of two years and including maintenance for 5 years under Smart City Mission. The bid due...
Integral Bulk Drug Biopharmaceutical facility at Bommasandra
The environmental clearance is sought for the proposed Integral Bulk Drug Biopharmaceutical facility and formulation facility for manufacturing drug substances...
Development of 2 nos collateral roads Shani mandir and Sector-28 Main road
Development of 2 nos collateral roads Shani mandir and Sector-28 Main road under smart city project Faridabad, Haryana. The bid due date is 28-Mar-2024. Tender...
Upper Burhner Project Dam in Madhya Pradesh
Construction of Upper Burhner Project Dam and Pressurised pipe irrigation network from Madhya Pradesh Water resources department, Govt. of Madhya Pradesh....
Foundation Stone Laid for Barethi Solar Power Project in Madhya Pradesh
NTPC REL is setting up 630 MW Barethi Solar Power Project at the Barethi Renewable Energy Park in Chhatarpur District. The foundation stone was recently...
Construction of Shed 197.43 Sq. Mtr at Jalna
Construction of Shed 197.43 Sq. Mtr. and Warehouse 2000 MT at Jalna District. The completion is targeted in 12 months. The bid due date is...
Sewage Treatment Plant at 8 Nos. Water Metro Terminals
Design, manufacturing, supply, installation, testing and commissioning of SBR Type Sewage Treatment Plant at 8 Nos. Water Metro Terminals (8 KLD - 1 No., ...
Construction of Warehouse-510 Mt for Sitamai Farmer Producer
Construction of Warehouse-510 Mt for Sitamai Farmer Producer Company Ltd. Shirte at Gat No.220. The completion is targeted in 6 months. The bid due date...
Pre-Engineered warehouse building at Parbhani
Dismantling old warehouse and construction of new 1/1800 MT Pre-Engineered warehouse building with ancillary works at warehouse complex Sailu, Dist. Parbhani. T...
Development of Ropeway between Ujjain Jn and Mahakaleshwar
Independent Engineer Services for Supervision of Development of Ropeway between Ujjain Jn Railway Station and Mahakaleshwar Temple in the State of Madhya Prades...
Expansion of solar cell manufacturing unit at Gangaikondan village
The environmental clearance is sought for the expansion of solar cell manufacturing unit with additional buildings by M/s. TP Solar Limited (Unit -2 ), at...
O&M of Rooftop Solar PV Project of Mumbai Metro Line-3
Design, engineering, supply, installation, testing, commissioning and comprehensive Operation and Maintenance of Roof Top Solar PV Project and associated suppor...
Expansion in existing unit at Piraman village
Jayshree Aromatics is seeking environmental clearance for the proposed expansion in existing unit at Piraman village, Bharuch District, Gujarat....
Group Housing Colony at Village Chauma
Puri Construction is seeking environmental clearance for the proposed Group Housing Colony on land area measuring 12.168 falling in the revenue estate of Villag...
Construction of Type III quarters at Netaji Nagar
Redevelopment of GPRA Colony at Netaji Nagar, New Delhi. SH: Construction of Type III quarters 1532 Nos, Community Hall, and allied works on Design, Engineering...
Indian Oil Commissions MEG Project in Paradip Refinery
Indian Oil Corporation Limited successfully commissions its Mono Ethylene Glycol (MEG) project at the Paradip Refinery. This initiative will supply raw material...
Installation of two lifts in Pellet Plant Unit at Panambur
Civil and Structural work in connection with installation of two lifts in Pellet Plant Unit, KIOCL Limited, Panambur, Mangaluru. The bid due date is 29-Mar-2024...
HAL Secures Contracts Worth Rs 8,073.17 Crore for ALH Dhruv Mk III
Hindustan Aeronautics Limited (HAL) announces the signing of two contracts worth Rs 8,073.17 crore with the Ministry of Defence on March 13, 2024. The contracts...
