Airfloa Rail Technology Order from ICF Chennai
Airfloa Rail Technology has received an order worth Rs. 2.84 crore on 20 November 2025 from Integral...
Oriental Foundry Knuckle Supply Order from Eastern Railway
Oriental Foundry Knuckle Supply Order from Eastern Railway...
Oriental Foundry Knuckle Supply Order from Eastern Railway
Oriental Foundry, a wholly owned subsidiary, has secured an order worth Rs. 3.67 crore for manufactu...
Oriental Foundry Coupler Body Order from South Railway
Oriental Foundry Coupler Body Order from South Railway...
Oriental Foundry Coupler Body Order from South Railway
Oriental Foundry has secured an order worth Rs. 2,93,86,602 for manufacturing and supplying 826 coup...
Elevated Corridor Project at Bengaluru
The detailed project report for a 110-km elevated corridor in Bengaluru has been approved by the technical advisory committee of Greater Bengaluru Aut...
Oriental Foundry Order from North Western Railway
Oriental Foundry, a wholly owned subsidiary, has secured an order from North Western Railway for man...
Oriental Foundry Order from North Western Railway
Oriental Foundry Order from North Western Railway...
Jayant Infratech EPC Contract from Konkan Railway
Jayant Infratech has received a Letter of Acceptance from Konkan Railway Corporation for an EPC cont...
Jayant Infratech EPC Contract from Konkan Railway
Jayant Infratech EPC Contract from Konkan Railway...
Texmaco Rail OHE Modification Order from Central Railway
Texmaco Rail has received an order from Central Railway for modification of existing OHE systems in...
Texmaco Rail OHE Modification Order from Central Railway
Texmaco Rail OHE Modification Order from Central Railway...
Central Railway Order for Copper Jumper Replacement
Central Railway has awarded a contract worth Rs. 3.36 crore for replacement of copper G jumpers in t...
Central Railway Order for Copper Jumper Replacement
Central Railway Order for Copper Jumper Replacement...
Oriental Foundry secures Western Railway order for Coupler Yokes
Oriental Foundry, a wholly-owned subsidiary of Oriental Rail Infrastructure Limited, has secured an order from Western Railway for Coupler Yokes used...
Oriental Foundry secures Western Railway order
Oriental Foundry, a wholly-owned subsidiary of Oriental Rail Infrastructure Limited, has secured an order from Western Railway, for the manufacture an...
A B Infrabuild receives LoA for Mumbai 5th & 6th Line works
A B Infrabuild has received a Letter of Acceptance (LoA) on 7 November 2025 for works related to the proposed 5th & 6th railway line...
CONCOR Secures Contract for 12 BLSS Wagon Rakes
CONCOR has received an order from GATX India for 12 rakes of BLSS wagons with BVCM brake vans on a 10-year operating lease. Supplies are...
CONCOR Bags Order for 25 Reach Stackers
CONCOR has secured a contract from TIL Ltd. for the design, manufacturing, supply, and commissioning of 25 loaded reach stackers (RSTs). The supply ti...
CONCOR Wins BLSS Wagon Lease Contract (8 Rakes)
Container Corporation has received a contract from Touax Texmaco Railcar Leasing Pvt. Ltd. for supplying 8 rakes of BLSS wagons with BVCM brake vans o...
RVNL wins OHE upgradation work in Ramagundam-Kazipet section
Rail Vikas Nigam as received LOA from South Central Railway for Design, Supply, Erection, Testing and Commissioning for OHE up gradation of existing 1...
Ashoka Buildcon Bags Railway Electrification Contract
Ashoka Buildcon has secured a contract from North Western Railway, Ajmer for upgrading the existing electric traction system from 1×25 kV to 2×25 kV,...
