Construction of Structures on JaipurKotputli Section
NHAI plans to undertake the construction of structures at the 200 Feet Junction and widening of stru...
Strengthening and Improvement of Internal Road to Chalisgaon
Strengthening and construction of the existing four-lane internal road to Chalisgaon Town over a length of 3.90 km on NH-52 under the one-time improve...
Road Over Bridge at RangapaniNew Jalpaiguri Section
Brahmaputra Infrastructure has been declared L-1 for construction of a road over bridge in lieu of Level Crossing No. NC5 between Rangapani and New Ja...
6-Lane Flyover at Muzaffarnagar Bypass
Construction of a 6-lane flyover and approaches at the start of the Muzaffarnagar Bypass (Km 112.535...
Development of 4-Lane SirhindSehna Section (Package II)
NHAI plans to develop Package II of the 4-lane SirhindSehna section of NH-205AG, connecting DAK Exp...
Development of Package 2: Alandi Phata to Khed Highway Section
NHAI plans to undertake the development of Package 2 from Alandi Phata to Khed (km 28.925 to km 42.1...
Cable-Stayed Bridge over Muri Ganga River
Larsen & Toubro has won an order for construction of a 3.2 km extradosed cable-stayed bridge with approach roads over the Muri Ganga River....
Parking Lots Development on DelhiSaharanpur Highway
Development, operation, and maintenance of parking lots at different sections from Akshardham Junction to the Uttar Pradesh border on the DelhiSahara...
Civil and Maintenance Works at AIIMS Patna Residential Complex
Repair of bitumen roads, leveling of ground, painting of trees, brick edging along roads, and fixing of curtains in the gym at the residential complex...
Development of 4-Lane SirhindSehna Section (Package I)
NHAI plans to develop Package I of the 4-lane SirhindSehna section of NH-205AG, connecting NH-44 ne...
Restoration of Approach Road at BSPS Surangani
Restoration of damaged approach road and protection wall of the road to STP/Pump House No. 2 on the right bank of the river near BSPS,...
Development of KanpurKabrai GF Highway & Safety Works on NH-34
Development of 4/6-lane access-controlled KanpurKabrai greenfield highway from Km 0.000 (Kanpur Rin...
Wayside Amenities Development at Valluru on NH-16
Development, operation, and maintenance of wayside amenities at Valluru, Andhra Pradesh, at Km 1256+170 (LHS) on NH-16. The bid due date is 09-Feb-202...
Development of Nashik Phata Alandi Phata Highway (Package 1)
NHAI plans to develop Package 1 from Nashik Phata to Alandi Phata (km 12.190 to km 28.925) under the...
One-Time Improvement of Bypassed Sections on NH-544D, Andhra Pradesh
Strengthening under one-time improvement of bypassed/realigned sections of the Anantapur Muchukota...
Installation of Foot Over Bridge on UjjainGaroth Section
Installation of a foot over bridge at Chainage 4.300 on the UjjainGaroth section PKG-1 over the cross road Panchkroshi Marg on a standalone basis. Th...
Salemgarh Fee Plaza User Fee Collection
B.R. Goyal Infrastructure Limited has received a work order for engagement as user fee collection agency at Salemgarh Fee Plaza on NH-28....
Development of Aerocity Road Ramgarh (Zirakpur Bypass)
NHAI plans to develop the Aerocity RoadRamgarh (Zirakpur Bypass) stretch in Punjab under HAM mode,...
Development of Pagote Chowk Section of NH-348B
NHAI plans to undertake the PagoteChowk development project on NH-348B in Maharashtra under the BOT...
Capital Region Ring Road (Kuspangi Tangi Section) Development
NHAI plans to develop the KuspangiTangi section of the Capital Region Ring Road in Odisha under HAM...
Development of 4-Lane Flyover from Old Pune Naka to Boramani Naka
NHAI plans to develop a 10 km 4-lane flyover from Old Pune Naka to Boramani Naka on NH-65 in Solapur...
Operation of Jawar Fee Plaza
Highway Infrastructure Limited has received an LOA and entered into a contract agreement for operation of Jawar Fee Plaza on NH-530B (MathuraDevinaga...
