Development of Gudebellur Mahabubnagar Section
NHAI plans to develop the Gudebellur to Mahabubnagar section (80.01 km) of the HyderabadPanaji corr...
Development of Armoor Jagtial Highway
NHAI plans to develop the Armoor Jagtial highway section in Telangana under HAM mode, covering 64...
Four-Laning of Tiruvarur Bypass
NHAI plans to undertake the four-laning of the Tiruvarur bypass from KM 15/900 to KM 30/836 in Tamil...
Pavement Repair and Maintenance Works in Cantonment Area
Repair and maintenance of pavements including roadside berms, streets, lanes, and cantonment fund buildings using interlocking tiles and PCC during th...
Annual Maintenance of Cantonment Roads
Annual repair, maintenance, and carpeting of cantonment fund roads using hot mix paver finisher system during the year 202627. The bid due date is 28...
Construction of High Submersible Bridge over Ajnar River
Construction of a high submersible bridge across Ajnar River on NH-52 (Old NH-3) via Biaora Civil Hospital approach road. The bid due date is 28-Feb-2...
6-Lane Elevated Corridor for BangaloreChennai Expressway (Phase IV)
NHAI plans to construct Phase IV of the 6-lane elevated corridor of the BangaloreChennai Expressway...
Repair of Roads and Culverts under GE Dehradun
Repair of certain roads including side berms, culverts, and road furniture under AGE B/R-II of GE Dehradun. The bid due date is 26-Feb-2026. Tender ID...
Repair of Internal Roads at Birpur
Repair of certain internal roads in Birpur under AGE B/R-II of GE Dehradun. The bid due date is 26-Feb-2026. Tender ID: 2026_MES_751671_1....
Construction of Subway on NH-16 near Netaji Bridge
Construction of a subway near Netaji Bridge at Km 1100.245 on the Chinna Avutupalli to Kanaka Durgamma Varadhi stretch of the VijayawadaGundugolanu s...
Greenfield Expressway DPR Project Between Patna and Purnia
Environmental clearance is sought for the Proposed Greenfield Four Lane Expressway from Patna to Pur...
Four-Laning of BadnawarTimarwani Section of NH-752D
Construction of four-laning of the BadnawarPetlawadThandlaTimarwani section of NH-752D from Badnawar Bypass to Timarwani Interchange of the DelhiM...
Four-Laning of MuzaffarpurSitamarhiSonbarsa Section of NH-22
Four-laning of the Muzaffarpur Sitamarhi Sonbarsa section of NH-22 from Design Km 0.000 to Design Km 82.551 in the state of Bihar on...
Construction of Four-Lane Greenfield Corridor on NH-24 (Pkg II)
Construction of a four-lane greenfield corridor from GhazipurZamaniaSaiyad Raja section of NH-24 (Old NH-97) with extension up to the VaranasiRanch...
Construction of ROB on NH-35 for Multimodal Terminal Connectivity
Construction of road over bridge on NH-35 (VaranasiMirzapur section) in connection with rail connectivity of the multimodal terminal of IWAI in the s...
Construction of Six-Lane Indore Eastern Bypass (Package 1)
Construction of six-lane greenfield access-controlled Indore Eastern Bypass starting from design Km 64.000 near Pirkaradiya village and ending at desi...
Construction of Six-Lane Indore Eastern Bypass (Package 2)
Construction of six-lane greenfield access-controlled Indore Eastern Bypass starting from design Km 113.000 near Simrol/Datoda village and ending at d...
Wayside Amenities Development on DelhiAmritsarKatra Expressway (Pkg 14)
Developing, operating, and maintaining wayside amenities on the DelhiAmritsarKatra Expressway in the J&K section on lease basis under DBOT mode at P...
Wayside Amenities Development on DelhiAmritsarKatra Expressway (Pkg 15 RHS)
Developing, operating, and maintaining wayside amenities on the DelhiAmritsarKatra Expressway in the J&K section on lease basis under DBOT mode at P...
ROB between IPMJPI Section
A B Infrabuild Limited has received Letter of Acceptance for construction of Road Over Bridge between IPMJPI stations under Khurda Road Division....
Mundka Fee Plaza Operations UER-II
Highway Infrastructure Limited has received LOA from National Highways Authority of India for operations at Mundka Fee Plaza under UER-II (NH-344M & N...
H.L. RCC Bridge over River Gandak
Ashoka Buildcon Limited in joint venture has received order for construction of 2280 m H.L. RCC bridge over River Gandak with approach roads on EPC...
