CCTV Surveillance System at ACTREC Campus
Supply, installation, testing and commissioning of CCTV surveillance system for Shanti Sadan Buildin...
Brahmaputra Infrastructure Emerges L-1 for Jammu Legislature Works
Brahmaputra Infrastructure has emerged as the L-1 bidder for the balance work for construction of th...
BPCL to Add Lube Oil Plant at Bina Refinery
Bharat Petroleum Corporation Limited (BPCL) plans to revamp its hydrocracker unit and install a 200 KTPA Lube Oil Base Stock (LOBS) plant with related...
Brick Manufacturing Unit at Raigarh District
Prismo Steels Private Limited plans to establish a Brick Manufacturing Unit at Raigarh District, Chhattisgarh, with a production capacity of 40,000 br...
KIAL to Extend Runway to 4,000 Meters for Expansion
Kannur International Airport Limited (KIAL) will expedite its runway extension project, increasing its length from 3,050 meters to 4,000 meters to acc...
Quartz mining project in Dungarpur
Rajmaya Impex LLP has applied for environmental clearance for a quartz mining project at Khasra Nos. 6135/2827 and 6133/2827 near Karada village, Sagw...
Palatial Heights group housing project in Ghaziabad
Environmental clearance is sought for the Palatial Heights group housing project at Plot No. 8/GH-07, Sector-8, Siddhartha Vihar Yojna, Ghaziabad, Utt...
Raymond Realty seeks EC for Panchpakhadi mixed-use development
Raymond Realty has applied for environmental clearance for a proposed residential-cum-commercial project at S. No. 62/B/1/4, 62/B/1/5, 130/B, 131/A1,...
Splendor Landbase seeks EC for expanded Gurugram commercial colony
Environmental clearance is sought for the revision and expansion of a commercial colony project at Village Ullahwas, Sector 62, Gurugram. The proposal...
Maharashtra’s 1200 MW Malshej Ghat PSP seeks environmental clearance
Environmental clearance is sought for the Malshej Ghat pumped storage project, an off-stream closed-loop system comprising two newly constructed reser...
Heranba Industries proposes major capacity expansion at Vapi pesticide facility
Heranba Industries has proposed a significant expansion of its pesticide technical and intermediate manufacturing capacity from 12 TPM to 1,650 TPM at...
TCS SEZ Expansion at Indore
Tata Consultancy Services has applied for environmental clearance for the proposed expansion of its IT/ITES SEZ located at Scheme Nos. 151 & 169B, Vil...
Urban Square Commercial Complex at Ludhiana
Tampra Infratech has proposed Urban Square, a commercial project located at Ferozpur Road, Mullanpur Dakha, Ludhiana, Punjab. The development will inc...
Forever Distillery proposes expansion of ethanol distillery to 400 KLD
Forever Distillery Private Limited has sought environmental clearance to expand its existing distillery capacity from 200 KLD (molasses/cane juice syr...
Betul Biofuel proposes expansion of grain-based distillery to 450 KLPD
Betul Biofuel has sought environmental clearance for expanding its grain-based distillery capacity from 150 KLPD to 450 KLPD fuel ethanol, or alternat...
GACL – Expansion & Modification of Chloromethane and Chlorotoluene Plants
GACL has proposed an expansion and modification project involving its Chloromethane and Chlorotoluene plants. The plan includes enhancing Chloromethan...
Saya Piazza Obtains OC for Retail and Lifestyle Hub in Noida
Saya Group has received the occupancy certificate for its flagship commercial project, Saya Piazza, located at Jaypee Greens along the Noida Expressway. Spread...
Motiaz Launches Capital One Commercial Project Near Chandigarh
Motiaz has launched Motiaz Capital One, a premium high-street commercial development located on Airport Lights Road near Chandigarh. The project features commer...
PFCCL incorporates SPV for NERGS-III Siang Basin transmission project
PFC Consulting has formed a special purpose vehicle, NERGS III Siang Basin Transmission, to handle preparatory activities for the Siang Basin transmission proje...
User Fee Collection at Dondpur Fee Plaza near Jammu Semi Ring Road
Engagement of user fee collection agency on the basis of competitive bidding through e-tender for th...
Upgradation of 67.5 MLD Main Pumping Station & 15 MLD STP to 30 MLD
Design, upgradation, construction, erection, testing & commissioning of existing 67.5 MLD capacity M...
Supply & Installation of CCTV Surveillance System
Supply and installation of CCTV surveillance system. The bid due date is 23-Dec-2025. Tender ID: 202...
