Bullet train project begins assembly for 16 km tunnel section
NHSRCL plans to construct a 21-km-long tunnel for the Mumbai-Ahmedabad High Speed Rail (MAHSR) project between Bandra Kurla Complex (BKC) and Shilphata in...
Steel Bridge Launched for Mumbai–Ahmedabad Bullet Train Project
The second 100-metre span of a 2×100 metre steel bridge has been launched over NH-48 near Nadiad, Gujarat, for...
Mumbai–Ahmedabad Bullet Train Tunnel Works Reach 80% at BKC
The Mumbai-Ahmedabad Bullet Train project has completed 80% of excavation at Bandra Kurla Complex (BKC) statio...
