RITES wins Rs 53.5 crore contract from Andhra Pradesh Power Generation
RITES has secured an order from Andhra Pradesh Power Generation Corporation for constructing a bye-pass line connecting Rayalaseema Thermal...
EPC Contract Awarded for Track Doubling Project in Andhra Pradesh
An Engineering Procurement Construction (EPC) contract has been announced for the doubling of the track between Dupadu station (Excl) from K...
RITES secures Rs 454 crore turnkey contract for railway terminals in Karnataka
RITES Limited has announced the conversion of its project management consultancy contract with Karnataka Mining Environment Restoration Corp...
OHE Modification Works in Guntakal Division
SW-I: Guntakal Division Proposed redevelopment of Anantapur, Madanapalle, Kadiri, and Pakala stations under the Amrit Bharat Station scheme, including OHE mod...
Office Accommodation for RPF Post in Hyderabad Division
Hyderabad Division: Construction of office accommodation, including lock-up and toilets, for the RPF post at KRNT. The bid due date is 30-Sep-2024. Tender ID: 5...
Authority Engineer for Double Line Construction in SCR
SCR Construction Organisation seeks to appoint an Authority Engineer for providing Project Management Services (PMS) for the construction of a double line betwe...
RCC Overhead Tank and Pipeline Replacement in Gorakhpur
Construction of a 100,000-gallon capacity RCC overhead tank with 20-meter high RCC staging and a deep tubewell with a pump house, including the replacement of...
Slope Protection Works for Kottavalasa-Koraput Doubling Project
Execution of slope protection works in cutting/embankment between Araku and Darliput stations on the KK line under the Kottavalasa-Koraput Doubling Project in W...
BSRP Stations for Corridor-4B in Karnataka
Design and Construction of Nine Stations i.e. Elevated (1 No.) and At-Grade (8 Nos.) BSRP Stations of Corridor-4B at Channasandra, Horamavu, Hennur, Thanisandra...
Design and Construction of Elevated Viaduct and station for Corridor 1A. The bid due date is 17-Oct-2024. Tender ID: 2024_KRIDE_202814_1....
Oriental Rail Infrastructure Wins Order from ICF for Coach Seating
Oriental Rail Infrastructure Limited has secured order from Integral Coach Factory (ICF), Chennai for Supply and Installation of 13 sets of...
Reconstruction of Station Buildings at PCO & AWT Stations
Madurai Division - Reconstruction of station building at PCO & AWT Stations. The bid due date is 27-Sep-2024. Tender ID: MDU-W-20-2024-04...
RITES Consortium Wins Bid for DMRC Train Retrofit Work
The RITES Consortium has emerged as the lowest bidder (L-1) for the tender issued by Delhi Metro Rail Corporation Limited for retrofit work...
RITES Secures Railway Operations Order from Adani Ports
RITES Limited has bagged an order from Adani Ports & SEZ Limited (APSEZ) for Railway Operation & Maintenance Services at the Dhamra Port....
East Coast Railway Completes 9.1 km of Tunnels on Khurda Road-Balangir Line
East Coast Railway (ECoR) has finished constructing 9.1 km of tunnels out of the total 12.7 km planned for the Khurda Road-Balangir new line. The...
ARSS Infrastructure Projects Secures Contract for Koraput-Singapur Road Doubling
ARSS Infrastructure Projects Limited has received a work order from M/s SCPL-ARSS (JV) for the Koraput-Singapur Road Doubling Project. The scope of work include...
BSRP Stations for Corridor-4A in Karnataka
Construction of Nine (9 Nos.) Stations i.e. Elevated (1 No.) and At-Grade (8 Nos.) BSRP Stations of Corridor-4A at Heelalige, Singena Agrahara, Huskur, Ambedkar...
Feasibility Study for Orbital Rail-RRTS Link in Ghaziabad Initiated
The UP government has appointed the Ghaziabad Development Authority (GDA) as the nodal agency for the feasibility study of the orbital rail project, integral to...
Thane-Mulund Suburban Railway Project
The long-awaited suburban railway station project between Thane and Mulund has received a boost with Rs 185 crore sanctioned by Railway Ministry. The funding wi...
Order for Seats and Berths for LWSCN coaches
Bagged an order from Modern Coach Factory (MCF), Raebareli towards the Manufacturing and Supplying of 30 sets of Seats and Berths for LWSCN coaches....
Secunderabad Railway Station upgradation project
South Central Railway (SCR) is progressing with the Rs 700 crore modernization project for Secunderabad Railway Station, with 27% of the work completed. The red...
Western Railway’s Borivali-Virar Expansion Project Set for 2027
The Borivali-Virar Expansion Project on the Western Railway corridor is progressing, with estimates, designs, and drone surveys completed and alignment finalize...
