Neerganga Ispat seeks EC for greenfield steel production facility in Chhattisgarh
Neerganga Ispat has applied for environmental clearance for setting up a greenfield steel manufacturing facility at Boriya village, Berla tehsil, Beme...
Park Hotels seeks EC for expansion of Visakhapatnam hotel block
Apeejay Surrendra Park Hotels has sought environmental clearance for constructing a new hotel building at T.S. No. 966, Waltair Ward, Beach Road, Visa...
Educational Building Project at Ghansoli
Shri Vile Parle Kelavani Mandal has submitted an application for environmental clearance for an educational building project at Plot No. 1, Sector 06,...
KISS seeks EC for academic and hostel blocks in Patia
Kalinga Institute of Social Sciences has sought environmental clearance for construction of a G+3 academic block, an S+4 hostel block-2 and an S+4 hos...
Ramco Cements seeks EC for clinker and cement capacity expansion
Ramco Cements plans to expand clinker production from 4.685 to 5.922 MTPA, cement capacity from 3.65 to 5.11 MTPA and WHRB-based power generation from...
South Central Railway Advances 130 km/h Speed Upgrade
South Central Railway has received clearance to operate trains at 130 km/h across major routes, including the Golden Quadrilateral and Golden Diagonal corridors...
NHAI Begins Construction of New ROB at Katpadi
The National Highways Authority of India has started building a new steel bowstring road over bridge at Katpadi railway station on the MangaloreVillupuram High...
EBG Group opens global headquarters in Hyderabad
EBG Group has inaugurated its new global headquarters, EBG Powerhouse, in Hyderabad. The 22,000 sq ft facility, representing a USD 7 million investment over two...
IGGL invites PMC bids for Duliajan Feeder Line gas-pipeline project
Indradhanush Gas Grid Ltd. had recently floated bids to appoint a project management consultant for the Duliajan Feeder Line project in Assam. The consultant wi...
Short-Term Contract for Elevator Maintenance at SgTPP Stage-III
Short-term service contract for elevator maintenance at Stage-III, 1×660 MW, under EMIPH at SgTPP, W...
Sewage System, Rising Main, MPS and STP Works at Shivalik City and Nearby Villages
Provision of the main sewer system, laying of rising main, construction of main pumping station (MPS...
Replacement of Gate Valves for COG and BFG Lines at TPP Boilers
Replacement of isolating gate valves of the Coke Oven Gas (COG) and Blast Furnace Gas (BFG) lines of...
Micro ATM Deployment Order in Nagaur PACS
Atishay Limited has been awarded a work order from The Nagaur Central Cooperative Bank Ltd., under t...
Deep Industries Receives LOA from ONGC
Deep Industries has received a Letter of Award from Oil and Natural Gas Corporation Limited for prod...
CAMC for CCTV Cameras
Comprehensive Annual Maintenance Contract (CAMC) for CCTV cameras. The bid due date is 18-Dec-2025....
BMC Awards Mithi River Package III to AdaniAshokaAakshaya JV
The AdaniAshokaAakshaya Joint Venture has secured an order from the Brihanmumbai Municipal Corpora...
Development of Pantnagar Airport on EPC Basis
Development of Pantnagar Airport on Engineering, Procurement, and Construction (EPC) mode. The bid due date is 18-Dec-2025. Tender ID: 2025_AAI_252425...
Operation and Maintenance of Teendhar–Rajasthan–Madhya Pradesh Border Section of NH-52
Operation and maintenance of the Teendhar–Rajasthan–Madhya Pradesh border section of new NH-52 from km 355.537 to km 416.700 (old km 346.540 to km 408...
Construction of Six-Lane Elevated Corridor in Umbraj City, Maharashtra
Construction of a six-lane elevated corridor from km 698.600 to km 699.900 section of NH-48, including construction of slip roads and service roads in...
Construction of Six-Lane Elevated Corridor in Kuwarbav Section of NH-166, Maharashtra
Construction of a six-lane elevated corridor from km 12.695 to km 14.100 in the Kuwarbav section of NH-166 (descoped work of Ratnagiri Package 1) in...
Construction of Six-Lane Elevated Corridor in Kagal City, Maharashtra
Construction of a six-lane elevated corridor from km 593.766 to km 596.400, including slip roads and service roads, in Kagal City (descoped work of Ka...
Construction of Six-Lane Elevated Corridor and Flyover near Kolhapur City on NH-48
Elevated Kagal–Satara construction of six-lane elevated corridor from km 612.582 to km 617.540, including construction of a flyover towards Kolhapur C...
