Kadambari Pumped Storage Project
Avaada Aqua Batteries is seeking environmental clearance for Kadambari Pumped Storage Project (1560 MW) in Sir...
Medical College and 430-Bed Hospital Proposed in Bhandara
Environmental clearance is sought for the construction of a new government medical college with a capacity of...
Upgradation of Kanda–Bageshwar Road Planned
Rehabilitation and up-gradation to 2-lane configuration of Kanda to Bageshwar Road from km 103.25 to Km 122.72...
Strengthening and Maintenance of NH-27 Section Planned
Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR-09 BR-08 BR-07 BR-06) of NH-27...
DPR Consultancy Tendered for Bikaner–Kotputli Expressway
Consultancy Services for preparation of Detailed Project Report of Construction of Bikaner to Kotputli express...
Infrastructure Works Planned at Baiyappanahalli Depot for BMRCL Phase-2A
Modification of Repair Bay Line, RRV shed, and ETU building, and construction of new ASS/TSS building at exist...
Depot Modification and New Building Construction Planned at Baiyappanahalli
Modification of repair bay line, Rail Recovery Vehicle (RRV) shed and Electric Traction Unit (ETU) building, a...
Lift and CCTV Installation at Agra Metro Staff Quarters
Design, manufacture, supply, installation, testing, and commissioning of lifts and CCTV installation inside li...
Construction of Site Office and Workshop Shed at BTPS
Construction of site office cum workshop shed for proper and safe maintenance work of Boiler and its auxiliari...
ADB to Fund Rs.4,100 Crore Hyderabad Musi Riverfront Project
The Asian Development Bank will provide Rs. 4,100 crore in phased assistance for Hyderabad’s Musi Riverfront p...
ACME Hybrid Urja Secures Rs.3,184 Crore for 280 MW Renewable Project
ACME Hybrid Urja is a subsidiary of ACME Solar, has obtained long-term financing of Rs. 3,184 crore from REC f...
Tato-II Hydroelectric Project Receives Rs.8,146 Crore Approval
The Cabinet Committee on Economic Affairs has approved Rs. 8,146.21 crore investment for the 700 MW Tato-II Hy...
Etalin Hydropower Project Gets Environmental Clearance
Environmental clearance is received for the 3,087 MW Etalin hydroelectric project in Dibang Valley, Arunachal...
Nigdi–Chakan Metro DPR Discussions Near Finalisation
Maharashtra Metro Rail Corporation and Pimpri Chinchwad Municipal Corporation are finalising the detailed proj...
OnePlus Partners with BPL to Manufacture Tablets in India
OnePlus has partnered with Bhagwati Products (BPL) to produce premium tablets at BPL’s Greater Noida facility...
Greater Noida to Host 300 TPD Compressed Biogas Plant
The Greater Noida Industrial Development Authority plans to set up a 300 TPD compressed biogas (CBG) plant at...
MIC Electronics Wins Northern Railway LOA
MIC Electronics has received a Letter of Acceptance from Northern Railway for provision of passenger amenities...
G R Infraprojects Secures LOI for Renewable Power Evacuation Project
G R Infraprojects has received a Letter of Intent for the establishment of transmission systems to evacuate po...
Dev IT Wins Rajasthan Govt Web Portal Project
Dev Information Technology has secured a work order from RajCOMP Info Services Ltd., a Government of Rajasthan...
Vivo Bio Tech Wins Pre-Clinical Testing Contract
Vivo Bio Tech has secured a pre-clinical testing contract for a novel molecule in collaboration with a leading...
Arisinfra Solutions Wins Order from Vaishnavi Residencies
ArisUnitern RE Solutions, a Subsidiary Company of the Arisinfra Solutions, has secured the purchase order from...
Supply of Utility Track Vehicles to Indian Railways
BEML Limited has bagged order from Indian Railways for supply of Utility Track Vehicles with contract valuing...
